Holistic Performance Evaluation of Highway Design-Build Projects

被引:11
|
作者
Choi, Kunhee [1 ]
Jung, Inwoo [1 ]
Yin, Yangtian [1 ]
Gurganus, Charles [2 ]
Jeong, H. David [1 ]
机构
[1] Texas A&M Univ, Dept Construct Sci, 3137 TAMU,Francis Hall 305, College Stn, TX 77843 USA
[2] Texas A&M Univ Syst, Texas A&M Transportat Inst, Bryan, TX 77807 USA
关键词
Design-build; Alternative contracting method; Infrastructure trend; Highway; Project delivery; CHANGE ORDERS; COST; MODEL; IMPACT; TIME; DELIVERY;
D O I
10.1061/(ASCE)ME.1943-5479.0000781
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many state transportation agencies (STAs) have adopted alternative contracting methods, including design-build (DB) contracting, to accelerate construction. Although DB has become increasingly common in recent years, very little definitive information is available about its performance with regards to key project performance indicators for highway rehabilitation projects. The lack of holistic quantitative performance assessments may result in STAs being misled when attempting to determine the best procurement methods and techniques for significant projects. This study fills this knowledge gap by using a rich dataset to evaluate the performance of DB contracting. A series of quantitative analyses were conducted to assess the likely effects of DB contracts on key project performance measures such as schedule, cost, and change orders. The results reveal that DB facilitates on-time project completion and results in fewer contract change orders during construction. No strong evidence, which indicates that DB contracts lead to greater cost increases over the traditional method, was found. These findings provide historical data-driven performance results for DB contracting that STAs can reference when evaluating competing contracting methods and techniques for high-impact projects.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Performance of performance specifications in design-build highway projects
    Brochner, Jan
    Silfwerbrand, Johan
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2019, 19 (02): : 111 - 125
  • [2] Stipends in Highway Design-Build Projects
    Chaudhary, Niranjan A.
    Esmaeili, Behzad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [3] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [4] Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
    Tran, Dai Q.
    Diraviam, Guru
    Minchin, R. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [5] Benchmarking of large design-build highway projects
    Shrestha, Pramen Prasad
    Migilaccio, Giovanni Ciro
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (1994) : 17 - 25
  • [6] Percent Base Design and Initial Award Performance in Design-Build Highway Projects
    Papajohn, Dean
    El Asmar, Mounir
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (03)
  • [7] Geotechnical issues with large design-build highway projects
    Higbee, JB
    [J]. SOIL MECHANICS 2002: SOILS, GEOLOGY, AND FOUNDATIONS, 2002, (1808): : 147 - 152
  • [8] Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
    Tran, Dai Q.
    Molenaar, Keith R.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 153 - 162
  • [9] Challenges of Implementing Progressive Design-Build in Highway Construction Projects
    Alleman, Doug
    Tran, Dan
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [10] Public Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects
    Fathi, Medya
    Shrestha, Pramen P.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (11)