Benchmarking of large design-build highway projects

被引:0
|
作者
Shrestha, Pramen Prasad [1 ]
Migilaccio, Giovanni Ciro [1 ]
O'Connor, James T. [1 ]
Gibson, G. Edward, Jr. [2 ]
机构
[1] Univ Texas Austin, Civil Architectural & Environm Engn Dept, ARE CEPM, Austin, TX 78712 USA
[2] Univ Alabama, Tuscaloosa, AL 35487 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For generations, highway projects in the United States have been delivered with the traditional design-bid-build (DBB) project delivery method. In 1990, FHWA introduced Special Experimental Project Number 14 (SEP-14) to encourage state agencies to use more efficient alternative methods for delivering projects. As of 2002, approximately 140 SEP-14 projects have been built according to the design-build (DB) delivery method. Although the use of the DB method for transportation projects has increased noticeably in the past decade, attempts to measure project performance under DB as against DBB have been limited to small projects. To fill this research gap, an input-versus-output benchmarking approach was used to assess the performance of large DB highway projects. By means of this approach, factors that could affect performance of highway projects were identified, and a comprehensive methodology for benchmarking was developed. A sample of four DB projects (with contract amounts ranging from $126 million to $1.4 billion) was analyzed to determine how project characteristics and DB practices (inputs) affect project performance in terms of cost and schedule (outputs). Project cost and schedule performance show clear trends against 15 input factors. More data points are needed to determine correlations between these inputs and outputs. In addition, 11 DBB projects (with contract amounts ranging from $50 million to $100 million) were selected for a statistical comparison with DB projects.
引用
收藏
页码:17 / 25
页数:9
相关论文
共 50 条
  • [1] Geotechnical issues with large design-build highway projects
    Higbee, JB
    [J]. SOIL MECHANICS 2002: SOILS, GEOLOGY, AND FOUNDATIONS, 2002, (1808): : 147 - 152
  • [2] Stipends in Highway Design-Build Projects
    Chaudhary, Niranjan A.
    Esmaeili, Behzad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [3] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [4] Holistic Performance Evaluation of Highway Design-Build Projects
    Choi, Kunhee
    Jung, Inwoo
    Yin, Yangtian
    Gurganus, Charles
    Jeong, H. David
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (04)
  • [5] Performance of performance specifications in design-build highway projects
    Brochner, Jan
    Silfwerbrand, Johan
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2019, 19 (02): : 111 - 125
  • [6] Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
    Tran, Dai Q.
    Diraviam, Guru
    Minchin, R. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [7] Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
    Tran, Dai Q.
    Molenaar, Keith R.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 153 - 162
  • [8] Challenges of Implementing Progressive Design-Build in Highway Construction Projects
    Alleman, Doug
    Tran, Dan
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [9] Benchmarking the performance of design-build projects Development of project success index
    Lam, Edmond W. M.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2007, 14 (05) : 624 - 638
  • [10] Percent Base Design and Initial Award Performance in Design-Build Highway Projects
    Papajohn, Dean
    El Asmar, Mounir
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (03)