Holistic Performance Evaluation of Highway Design-Build Projects

被引:11
|
作者
Choi, Kunhee [1 ]
Jung, Inwoo [1 ]
Yin, Yangtian [1 ]
Gurganus, Charles [2 ]
Jeong, H. David [1 ]
机构
[1] Texas A&M Univ, Dept Construct Sci, 3137 TAMU,Francis Hall 305, College Stn, TX 77843 USA
[2] Texas A&M Univ Syst, Texas A&M Transportat Inst, Bryan, TX 77807 USA
关键词
Design-build; Alternative contracting method; Infrastructure trend; Highway; Project delivery; CHANGE ORDERS; COST; MODEL; IMPACT; TIME; DELIVERY;
D O I
10.1061/(ASCE)ME.1943-5479.0000781
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many state transportation agencies (STAs) have adopted alternative contracting methods, including design-build (DB) contracting, to accelerate construction. Although DB has become increasingly common in recent years, very little definitive information is available about its performance with regards to key project performance indicators for highway rehabilitation projects. The lack of holistic quantitative performance assessments may result in STAs being misled when attempting to determine the best procurement methods and techniques for significant projects. This study fills this knowledge gap by using a rich dataset to evaluate the performance of DB contracting. A series of quantitative analyses were conducted to assess the likely effects of DB contracts on key project performance measures such as schedule, cost, and change orders. The results reveal that DB facilitates on-time project completion and results in fewer contract change orders during construction. No strong evidence, which indicates that DB contracts lead to greater cost increases over the traditional method, was found. These findings provide historical data-driven performance results for DB contracting that STAs can reference when evaluating competing contracting methods and techniques for high-impact projects.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Selecting appropriate projects for design-build procurement
    Molenaar, KR
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 349 - 359
  • [42] EVALUATION OF DESIGN-BUILD PROPOSALS
    WARSZAWSKI, A
    [J]. BUILDING AND ENVIRONMENT, 1979, 14 (04) : 247 - 252
  • [43] Risk allocation in design-build and BOT projects
    Nielsen, KR
    [J]. CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53
  • [44] Importance of Noncost Criteria Weighing in Best-Value Design-Build US Highway Projects
    Calahorra-Jimenez, Maria
    Torres-Machi, Cristina
    Chamorro, Alondra
    Alarcon, Luis F.
    Molenaar, Keith
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [45] Largest California highway design-build project opens
    不详
    [J]. CIVIL ENGINEERING, 1996, 66 (10): : 26 - &
  • [46] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [47] Environmental Reevaluations for Design-Build Highway Projects: Implementing the SR 520 Bridge Replacement and HOV Program
    Kucharski, Margaret
    Spellecacy, Rona
    [J]. ENVIRONMENTAL PRACTICE, 2014, 16 (03) : 239 - 245
  • [48] Contractors' influence within the design process of design-build projects
    Haroglu, H.
    Glass, J.
    Thorpe, T.
    Goodchild, C.
    [J]. CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 693 - 698
  • [49] Contractor prequalification expert system for Design-Build projects
    Palaneeswaran, E
    Kumaraswamy, MM
    [J]. NOVEL DESIGN AND INFORMATION TECHNOLOGY APPLICATIONS FOR CIVIL AND STRUCTURAL ENGINEERING, 1999, : 103 - +
  • [50] Choosing Appropriate Contract Methods for Design-Build Projects
    Chen, Qing
    Xia, Bo
    Jin, Zhigang
    Wu, Peng
    Hu, Yi
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)