Choosing Appropriate Contract Methods for Design-Build Projects

被引:13
|
作者
Chen, Qing [1 ]
Xia, Bo [2 ]
Jin, Zhigang [3 ]
Wu, Peng [4 ]
Hu, Yi [5 ]
机构
[1] Gasu Adorn Design Engn Co Ltd, Green Bldg Res Ctr, Shenzhen 518001, Peoples R China
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4000, Australia
[3] Sichuan Univ, Coll Architecture & Environm, Chengdu 610065, Peoples R China
[4] Curtin Univ, Dept Construct Management, Perth, WA 6845, Australia
[5] Tongji Univ, Sch Econ & Management, Dept Construct Management & Real Estate, Shanghai 200092, Peoples R China
关键词
Design-build; Contract type; Lump sum; GMP; Cost plus fee;
D O I
10.1061/(ASCE)ME.1943-5479.0000393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For design-build (DB) projects, owners normally use lump sum and guaranteed maximum price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners' selection of contract arrangement. Project information from the Design-Build Institute of America database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump-sum contracts. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently, and the qualification-oriented contractor selection process resorts to GMP more often compared with the cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Design-build contract award methods for transportation projects
    Gransberg, DD
    Senadheera, SP
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1999, 125 (06): : 565 - 567
  • [2] Selecting appropriate projects for design-build procurement
    Molenaar, KR
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 349 - 359
  • [3] Comparing procurement methods for design-build projects
    El Wardani, MA
    Messner, JI
    Horman, MJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (03) : 230 - 238
  • [4] Design guidelines for design-build projects
    Fredrickson, K
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) : 77 - 80
  • [5] Management and Contract Allocation of Geotechnical Risks on Mega Design-Build Infrastructure Projects
    Dawoody, Hajer W.
    Gad, Ghada M.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 210 - 218
  • [6] Determinants of successful design-build projects
    Lam, Edmond W. M.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (05) : 333 - 341
  • [7] Stipends in Highway Design-Build Projects
    Chaudhary, Niranjan A.
    Esmaeili, Behzad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [9] Value Creation in Design-Build Projects
    Bremdal, Jon Harald
    Haddadi, Amin
    Bjorberg, Svein
    Lohne, Jardar
    Laedre, Ola
    [J]. 2017 12TH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), VOL. 2, 2017, : 58 - 66
  • [10] Precontract Negotiations in Design-Build Projects
    Erkal, Elif Deniz Oguz
    Molenaar, Keith
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 1 - 10