Calculation of Cable Force for Long-Span Rib Arch Bridge Construction Under Seasonal Ambient Temperature

被引:0
|
作者
Tian, Weifeng [1 ,2 ]
Zhou, Shuixing [1 ]
Saeed, Ayad Thabit [2 ]
机构
[1] Chongqing Jiaotong Univ, Sch Civil Engn & Architecture, Chongqing 400074, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
关键词
Non-framework cable hoisting erection method; Long-span arch rib bridge; Cable force; Seasonal ambient temperature; Unstressed state control method;
D O I
10.4028/www.scientific.net/AMR.378-379.341
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Calculation of cable force under seasonal ambient temperature is the key and difficult problem in the construction of long-span rib arch bridge. It affects the final cable forces and deformations of arch rib after arch closure. Unstressed state control method is introduced in the construction of Daning River Bridge; unstressed qualities of ribs and unstressed length of cables can be obtained by optimization analysis of the maximum cantilever state in construction. According to unstressed state control method, the cable forces of each segment were calculated using the forward-iteration method. These results offer the basis for construction control, and guarantee the arch rib line and cable forces to meet the design requirements, and an arch closure with high precision.
引用
收藏
页码:341 / +
页数:2
相关论文
共 50 条
  • [1] Construction Simulation of Long-Span Arch Rib Bridge
    Tian, Weifeng
    Zhou, Shuixing
    Zhang, Liangliang
    Saeed, Ayad Thabit
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 871 - +
  • [2] Analyze on Construction Status Long-Span Arch Rib Bridge by Numerical Simulation
    Hao, Jiang
    MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1318 - 1323
  • [3] Ambient vibration of long-span cable-stayed bridge
    Chang, C.C.
    Chang, T.Y.P.
    Zhang, Q.W.
    Journal of Bridge Engineering, 2001, 6 (01) : 46 - 53
  • [4] Aerodynamic characteristics of a long-span cable-stayed bridge under construction
    Ma, Cunming
    Duan, Qingsong
    Li, Qiusheng
    Liao, Haili
    Tao, Qi
    ENGINEERING STRUCTURES, 2019, 184 : 232 - 246
  • [5] Calculation method of main cable system construction control of long-span suspension bridge
    Huang, Pingming
    Mei, Kuihua
    Xu, Yue
    Xi'an Gonglu Xueyuan Xuebao/Journal of Xi'an Highway Transportation University, 2000, 20 (04): : 19 - 22
  • [6] Longitudinal Force Distribution of CWR on Long-span Arch Bridge
    Yan B.
    Fu H.
    Yu L.
    Wang W.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (03): : 9 - 15
  • [7] Research on the calculation method of construction control on bearing cable system of long-span suspension bridge
    Huang, Pingming
    Mei, Kuihua
    Sun, Shengjiang
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2000, 13 (03): : 45 - 48
  • [8] Construction Control Calculation Method for Long-Span Cable-Stayed Bridge Based on Cable Length and Application
    Mei, Xiu-Dao
    Lu, Yi-Yan
    Bridge Construction, 2019, 49 (06) : 42 - 47
  • [9] Calculation method of eccentricity increase coefficient of arch rib of long⁃span arch bridge
    Guo F.
    Li P.-F.
    Mao J.-Y.
    Dong Y.-Z.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (06): : 1404 - 1412
  • [10] Rib Alignment Control of Long-Span Arch Bridge in Cable-Stayed Buckle by Multi-Objective Optimization
    Yu, Mengsheng
    Yao, Xinyu
    Wang, Longlin
    Hao, Tianzhi
    Deng, Nianchun
    Buildings, 2024, 14 (10)