Minimizing tardiness for job shop scheduling under uncertainties

被引:0
|
作者
Yahouni, Zakaria [1 ,2 ]
Mebarki, Nasser [1 ]
Sari, Zaki [3 ]
机构
[1] Univ Nantes, UMR CNRS 6597, LUNAM, IRCCyN, Nantes, France
[2] Univ Tlemcen, MELT, Tilimsen, Algeria
[3] Izmir Univ Econ, Dept Ind Engn, Izmir, Turkey
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Many disturbances can occur during the execution of a manufacturing scheduling process. To cope with this drawback, flexible solutions are proposed based on the offline and the online phase of the schedule. Groups of permutable operations is one of the most studied flexible scheduling methods bringing flexibility as well as quality to a schedule. The online phase of this method is based on a human-machine system allowing to choose in real-time one schedule from a set of schedules that fits best the real state of the system. In this paper, we propose and evaluate a new criterion called the best-case in order to be used in real-time during the online phase of the groups of permutable operations. This criterion offers an optimal or near-optimal solution from a set of solutions. The usefulness of this criterion is showed using a comparative review with two other criteria on a benchmark instances using the maximum tardiness objective.
引用
收藏
页码:582 / 587
页数:6
相关论文
共 50 条
  • [21] Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
    Yu, Jae-Min
    Lee, Dong-Ho
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (01) : 1 - 23
  • [22] Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem
    Yazdani, Maziar
    Aleti, Aldeida
    Khalili, Seyed Mohammad
    Jolai, Fariborz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 12 - 24
  • [23] Novel decoding method for Job Shop earliness and tardiness scheduling problem
    Yang, Hong-An
    Sun, Qi-Feng
    Li, Jin-Yuan
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2652 - 2659
  • [24] A joint model of production scheduling and predictive maintenance for minimizing job tardiness
    Ershun Pan
    Wenzhu Liao
    Lifeng Xi
    The International Journal of Advanced Manufacturing Technology, 2012, 60 : 1049 - 1061
  • [25] EVALUATION OF A NEW DECISION-AID PARAMETER FOR JOB SHOP SCHEDULING UNDER UNCERTAINTIES
    Yahouni, Zakaria
    Mebarki, Nasser
    Sari, Zaki
    RAIRO-OPERATIONS RESEARCH, 2019, 53 (02) : 593 - 608
  • [26] Minimizing makespan for scheduling stochastic job shop with random breakdown
    Lei, De-ming
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (24) : 11851 - 11858
  • [27] Extended GRASP for the job shop scheduling problem with total weighted tardiness objective
    Bierwirth, C.
    Kuhpfahl, J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 835 - 848
  • [28] Earliness/tardiness flow-shop scheduling under uncertainty
    Li, SF
    Zhu, YL
    Li, XY
    ICTAI 2005: 17TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2005, : 499 - 506
  • [29] A no-tardiness job shop scheduling problem with overtime consideration and the solution approaches
    Shi, Shuangyuan
    Xiong, Hegen
    Li, Gongfa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 178
  • [30] Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    Cassady, CR
    Kutanoglu, E
    IIE TRANSACTIONS, 2003, 35 (06) : 503 - 513