A no-tardiness job shop scheduling problem with overtime consideration and the solution approaches

被引:11
|
作者
Shi, Shuangyuan [1 ]
Xiong, Hegen [1 ]
Li, Gongfa [1 ]
机构
[1] Wuhan Univ Sci & Technol, Sch Mech Engn & Automat, 947 Heping Rd, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Job shop scheduling; No tardiness; Overtime; Decoding; Non-parametric statistical test; DEPENDENT SETUP TIMES; HYBRID GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; ORDER RELEASE; TABU SEARCH; MACHINE; EARLINESS; MINIMIZE; SUBJECT; COST;
D O I
10.1016/j.cie.2023.109115
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In make-to-order manufacturing environments, overtime work is one of the effective and commonly used re-sources for expanding production capacity to ensure orders on-time delivery. However, if overtime work is not used reasonably and optimally, not only it cannot expedite the order completion, but also may lead to an increase in manufacturing costs. In order to use overtime work optimally, this paper presents a no-tardiness job shop scheduling problem with overtime work consideration (NTJSSP-OW) to minimize the total earliness inventory and overtime work costs simultaneously. A mathematical model is formulated and a hybrid genetic algorithm with simulated annealing (GASA) is proposed to solve it. Nine algorithms are also selected for performance comparisons. Unlike the traditional job shop scheduling problem, when solving NTJSSP-OW by heuristics and meta-heuristics, no-tardiness constraint is more likely to lead to infeasible solutions. So a multi-stage decoding scheme with a reconstructing rule is developed to ensure feasible solution. In order to extend the search space, a dispatching rule-based population initialization procedure and a repairing mechanism are provided. Compre-hensive experiments are conducted on 14 modified benchmark problems, and non-parametric statistical tests like the Friedman test and post-hoc Nemenyi test are performed for the experimental results. Further systematic analyses indicate that GASA has significantly faster convergence on 90% of all test instances, and its global search ability outperforms other competing algorithms for 12 out of 14 instances.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Research on Multi-objective Golden Eagle Optimizer for No-tardiness Job Shop Scheduling Problems with Overtime Consideration
    Shi S.
    Xiong H.
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2023, 34 (17): : 2077 - 2088
  • [2] Multi-objective differential evolution algorithm for no-tardiness job shop scheduling problem with outsourcing option
    Shi, Shuangyuan
    Xiong, Hegen
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (12): : 4352 - 4368
  • [3] A multiagents approach for the job shop scheduling problem with earliness and tardiness
    Valencia, LB
    Rabadi, G
    2003 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-5, CONFERENCE PROCEEDINGS, 2003, : 1217 - 1222
  • [4] Minimising the total cost of tardiness and overtime in a resumable capacitated job shop scheduling problem by using an efficient hybrid algorithm
    Rohaninejad M.
    Sahraeian R.
    Nouri B.V.
    Rohaninejad, Mohammad (rohaninejad.sm@gmail.com), 2017, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (26) : 318 - 343
  • [5] Job-shop scheduling problem with energy consideration
    Masmoudi, Oussama
    Delorme, Xavier
    Gianessi, Paolo
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 216 : 12 - 22
  • [6] A survey of approaches to the job shop scheduling problem
    Sellers, DW
    PROCEEDINGS OF THE TWENTY-EIGHTH SOUTHEASTERN SYMPOSIUM ON SYSTEM THEORY, 1996, : 396 - 400
  • [7] Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem
    Yazdani, Maziar
    Aleti, Aldeida
    Khalili, Seyed Mohammad
    Jolai, Fariborz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 12 - 24
  • [8] Novel decoding method for Job Shop earliness and tardiness scheduling problem
    Yang, Hong-An
    Sun, Qi-Feng
    Li, Jin-Yuan
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2652 - 2659
  • [9] Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
    Yu, Jae-Min
    Lee, Dong-Ho
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (01) : 1 - 23
  • [10] Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem
    Jamili, A.
    GhannadPour, S. F.
    GhoreshiNejad, M. R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2014, 27 (07): : 1091 - 1098