共 50 条
- [1] A multiagents approach for the job shop scheduling problem with earliness and tardiness 2003 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-5, CONFERENCE PROCEEDINGS, 2003, : 1217 - 1222
- [4] Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1871 - 1891
- [5] Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1871 - 1891
- [6] Hybrid estimation of distribution algorithm for stochastic Job shop scheduling with earliness/tardiness penalty Kongzhi yu Juece Control Decis, 10 (1854-1860):
- [8] Multiagent scheduling method with earliness and tardiness objectives in flexible job shops IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2005, 35 (02): : 293 - 301
- [9] Differential Evolution Algorithm for the Earliness/Tardiness Hybrid Flow-shop Scheduling Problem 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL 2, PROCEEDINGS, 2009, : 188 - 193
- [10] A FUZZY MATHEMATICAL MODEL FOR MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM WITH NEW JOB INSERTION AND EARLINESS/TARDINESS PENALTY INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2021, 28 (03): : 256 - 276