共 50 条
- [2] An approach for earliness and tardiness scheduling problems of flow shop with uncertainty [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7317 - 7321
- [4] Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1871 - 1891
- [5] Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1871 - 1891
- [6] Hybrid estimation of distribution algorithm for stochastic Job shop scheduling with earliness/tardiness penalty [J]. Kongzhi yu Juece Control Decis, 10 (1854-1860):
- [9] Differential Evolution Algorithm for the Earliness/Tardiness Hybrid Flow-shop Scheduling Problem [J]. 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL 2, PROCEEDINGS, 2009, : 188 - 193
- [10] An hybrid SA-DATC Approach for JIT Open-Shop Scheduling Problem with Earliness and Tardiness Penalties [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 2396 - 2401