Bayesian Probabilistic Numerical Methods in Time-Dependent State Estimation for Industrial Hydrocyclone Equipment

被引:11
|
作者
Oates, Chris J. [1 ,2 ]
Cockayne, Jon [3 ]
Aykroyd, Robert G. [4 ]
Girolami, Mark [2 ,5 ]
机构
[1] Newcastle Univ, Sch Math Stat & Phys, Newcastle Upon Tyne NE1 7RU, Tyne & Wear, England
[2] Alan Turing Inst, London, England
[3] Univ Warwick, Dept Stat, Coventry, W Midlands, England
[4] Univ Leeds, Sch Math, Leeds, W Yorkshire, England
[5] Imperial Coll London, Dept Math, London, England
基金
英国工程与自然科学研究理事会; 澳大利亚研究理事会; 美国国家科学基金会;
关键词
Electrical tomography; Inverse problems; Partial differential equations; Probabilistic meshless methods; Sequential Monte Carlo; ELECTRICAL-IMPEDANCE TOMOGRAPHY; MONTE-CARLO METHODS; INVERSE PROBLEMS; DIFFERENTIAL-EQUATIONS; ELECTRODE MODELS; APPROXIMATION; ALGORITHMS; COMPLEXITY; INFERENCE;
D O I
10.1080/01621459.2019.1574583
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
The use of high-power industrial equipment, such as large-scale mixing equipment or a hydrocyclone for separation of particles in liquid suspension, demands careful monitoring to ensure correct operation. The fundamental task of state-estimation for the liquid suspension can be posed as a time-evolving inverse problem and solved with Bayesian statistical methods. In this article, we extend Bayesian methods to incorporate statistical models for the error that is incurred in the numerical solution of the physical governing equations. This enables full uncertainty quantification within a principled computation-precision trade-off, in contrast to the over-confident inferences that are obtained when all sources of numerical error are ignored. The method is cast within a sequential Monte Carlo framework and an optimized implementation is provided in Python.
引用
收藏
页码:1518 / 1531
页数:14
相关论文
共 50 条
  • [21] Time-dependent optimal heater control using analytic and numerical methods
    Yun-De Shen
    Zhen-Zhe Li
    Dong-Ji Xuan
    Kwang-Su Heo
    Seoung-Yun Seol
    International Journal of Precision Engineering and Manufacturing, 2010, 11 : 77 - 81
  • [22] Time-Dependent Optimal Heater Control Using Analytic and Numerical Methods
    Shen, Yun-De
    Li, Zhen-Zhe
    Xuan, Dong-Ji
    Heo, Kwang-Su
    Seol, Seoung-Yun
    INTERNATIONAL JOURNAL OF PRECISION ENGINEERING AND MANUFACTURING, 2010, 11 (01) : 77 - 81
  • [23] TIME-DEPENDENT PROBABILISTIC FAILURE OF COATED COMPONENTS
    CASSENTI, BN
    AIAA JOURNAL, 1991, 29 (01) : 127 - 134
  • [24] Probabilistic time-dependent vehicle routing problem
    Tomáš Režnar
    Jan Martinovič
    Kateřina Slaninová
    Ekaterina Grakova
    Vít Vondrák
    Central European Journal of Operations Research, 2017, 25 : 545 - 560
  • [25] Probabilistic time-dependent vehicle routing problem
    Reznar, Tomas
    Martinovic, Jan
    Slaninova, Katerina
    Grakova, Ekaterina
    Vondrak, Vit
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2017, 25 (03) : 545 - 560
  • [26] Discontinuous Galerkin Methods with Time-Operators in Their Numerical Traces for Time-Dependent Electromagnetics
    Cockburn, Bernardo
    Du, Shukai
    Sanchez, Manuel A.
    COMPUTATIONAL METHODS IN APPLIED MATHEMATICS, 2022, 22 (04) : 775 - 796
  • [27] A unified framework for state and time-dependent parameter estimation of automotive engines
    Singh V.
    Pal B.
    Jain T.
    Mechanical Systems and Signal Processing, 2024, 218
  • [28] Bayesian state estimation of a flexible industrial robot
    Axelsson, Patrik
    Karlsson, Rickard
    Norrlof, Mikael
    CONTROL ENGINEERING PRACTICE, 2012, 20 (11) : 1220 - 1228
  • [29] Positioning Accuracy Analysis of Industrial Robots Based on Non-Probabilistic Time-Dependent Reliability
    Yang, Chen
    Lu, Wanze
    Xia, Yuanqing
    IEEE TRANSACTIONS ON RELIABILITY, 2024, 73 (01) : 608 - 621
  • [30] Adiabatic time-dependent density functional methods for excited state properties
    Furche, F
    Ahlrichs, R
    JOURNAL OF CHEMICAL PHYSICS, 2002, 117 (16): : 7433 - 7447