Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong

被引:49
|
作者
Huo, Tengfei [1 ]
Ren, Hong [1 ]
Cai, Weiguang [1 ]
Shen, Geoffrey Qiping [2 ]
Liu, Bingsheng [3 ]
Zhu, Minglei [1 ]
Wu, Hengqin [3 ]
机构
[1] Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400044, Peoples R China
[2] Tianjin Univ, Sch Management & Econ, Tianjin 300072, Peoples R China
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
关键词
Cost overruns; Megainfrastructure projects; Characteristics; Dependence analysis; Hong Kong; PUBLIC-WORKS PROJECTS; CONSTRUCTION PROJECTS; BID EVALUATION; DECISION; PERFORMANCE; ESCALATION; DELAYS;
D O I
10.1061/(ASCE)CO.1943-7862.0001444
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates the characteristics of the cost performance of megatransport infrastructure projects in Hong Kong and performs dependence analysis of cost overruns. It is based on 57 samples of road, rail, bridge, and tunnel projects over the period of 1985-2015 and pursues the following two objectives: (1)it measures the characteristics of cost overruns in Hong Kong megatransport infrastructure projects using case data and statistical analysis method; and (2)it examines three independent explanatory variables (i.e.,project type, size of the project, and length of the project implementation period) and their statistical relationship with cost overruns to determine whether there exist differences between Hong Kong infrastructure projects and the worldwide findings. The results indicate that, in Hong Kong, projects on average have a cost escalation of 39.18% and the average cost overrun is 34.83% for rail, 32.52% for road projects, and 37.48% for fixed-link (i.e.,bridges and tunnels) projects. The year of the decision to build has no effect on cost escalation. The major findings concerning the dependence of cost escalations are as follows. In terms of project type, rail projects are most prone to cost increase, followed by fixed-links, whereas road projects are the least vulnerable to cost escalations. Cost overruns have no significant relationship with project size, but for road projects, smaller scale projects tend to be more prone to larger cost overruns. The cost overruns strongly depend on the length of the implementation phase; cost escalations increase 1.35% with each additional year of preconstruction period. This indicates that the preconstruction phase length can be viewed as a better indicator of cost escalations compared to the construction length. This can be an essential contribution to the existing literature on cost overruns as the stage in which the infrastructures are most prone to cost escalations is considerably narrowed down. The practical implications of this study are that decision makers should focus on this period and pay more attention to delays and longer preconstruction phases if they want to determine the causes and solutions of cost overruns. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Supplier development and its incentives in infrastructure mega-projects: A case study on Hong Kong-Zhuhai-Macao Bridge project
    Wei ZENG
    Jinwen ZHANG
    Hongwei WANG
    Hongtao ZHOU
    Frontiers of Engineering Management, 2018, 5 (01) : 88 - 97
  • [32] On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects
    Cavalieri, Marina
    Cristaudo, Rossana
    Guccio, Calogero
    TRANSPORT POLICY, 2019, 79 : 21 - 36
  • [33] Significant risks that trigger cost overruns and delays in urban rail projects: a typical case study of Vietnam
    Nguyen, Tiep
    Chileshe, Nicholas
    Ho, Duc Ty
    Nguyen, Viet Thanh
    Tran, Quang Phu
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (02) : 278 - 295
  • [34] Reasons for delay in civil engineering projects - the case of Hong Kong
    Chan, Daniel W.M.
    Kumaraswamy, Mohan M.
    Transactions Hong Kong Institution of Engineers, 1996, 2 (03): : 1 - 8
  • [35] Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects
    Wan, Sammy K. M.
    Kumaraswamy, Mohan M.
    Liu, Davis T. C.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (07): : 637 - 646
  • [37] UNSCHOOLING IN HONG KONG: A CASE STUDY
    Riley, Gina
    JOURNAL OF UNSCHOOLING AND ALTERNATIVE LEARNING, 2016, 10 (20) : 1 - 15
  • [38] Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region
    Canales, Fausto A.
    Mora, Otto
    Arrieta-Castro, Marco
    Moreno-Natera, Anibal
    del Savio, Alexandre
    BULLETIN OF GEOGRAPHY-SOCIO-ECONOMIC SERIES, 2023, 61 (61) : 59 - 70
  • [39] BIM cost analysis of transport infrastructure projects
    Volkov, Andrey
    Chelyshkov, Pavel
    Grossman, Y.
    Khromenkova, A.
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [40] Physics-Driven Based Resilience Analysis of Interdependent Civil Infrastructure Systems-A Case Study in Hong Kong
    Yang, Yifan
    Ng, S. Thomas
    Zhou, Shenghua
    Xu, Frank J.
    Li, Hongyang
    COMPUTING IN CIVIL ENGINEERING 2019: SMART CITIES, SUSTAINABILITY, AND RESILIENCE, 2019, : 563 - 569