On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects

被引:24
|
作者
Cavalieri, Marina [1 ]
Cristaudo, Rossana [2 ]
Guccio, Calogero [1 ]
机构
[1] Univ Catania, Dept Econ & Business, Corso Italia 55, I-95129 Catania, Italy
[2] Univ Messina, Management & Stat, Messina, Italy
关键词
Cost overruns; Project life-cycle; Transport infrastructure; Roads; Italy; EMPIRICAL-EVIDENCE; FRONT-END; PERFORMANCE; DETERMINANTS; PROCUREMENT; CORRUPTION; EXECUTION;
D O I
10.1016/j.tranpol.2019.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
The cost performance of infrastructure projects is a serious problem worldwide. This paper aims to analyse the generating process of cost overruns along the various phases of the project life-cycle. To this purpose, we employ a large dataset of Italian transport infrastructure projects for roads, started and completed during the period 2000-2013. Applying the same methodology used by the construction management research, we breakdown the various phases of the project life-cycle as well as the related cost items (estimated or actual) to analyse empirically the role of each phase in the overall evolution of cost overruns. Specifically, we pay particular attention to the costs for the physical execution of the work, distinguishing them from all other costs. The results show that Italian public infrastructure works suffer from significant cost overruns in the execution phase. However, the Italian contracting authorities seem to systematically overestimate the size of the final costs for the physical realization of the work. This risk aversion attitude is more relevant when considering financial coverage (rather than budget) and it is likely to leave room for opportunistic behaviours in the execution phase. In terms of policy implications, our results suggest the adoption of more stringent (and objective) criteria to assess the project budget and to provide its financial coverage.
引用
收藏
页码:21 / 36
页数:16
相关论文
共 50 条
  • [1] Life-Cycle Cost tenders for infrastructure projects
    Bakker, Jaap
    Volwerk, Joris
    [J]. LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 103 - 110
  • [2] Causes of cost overruns in transport infrastructure projects in Asia Their significance and relationship with project size
    Park, Young-Ill
    Papadopoulou, Theopisti C.
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (02) : 195 - 216
  • [3] Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
    Cantarelli, C. C.
    Molin, E. J. E.
    van Wee, B.
    Flyvbjerg, B.
    [J]. TRANSPORT POLICY, 2012, 22 : 49 - 56
  • [4] How common and how large are cost overruns in transport infrastructure projects?
    Flyvbjerg, B
    Holm, MKS
    Buhl, SL
    [J]. TRANSPORT REVIEWS, 2003, 23 (01) : 71 - 88
  • [5] The execution of infrastructure project life-cycle
    Willar, Debby
    Waney, Estrellita V. Y.
    Senduk, Novatus
    [J]. INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS (SCESCM 2018), 2019, 258
  • [6] Comprehensive Infrastructure Life-Cycle Assessment
    Strauss, A.
    Grossberger, H.
    Bergmeister, K.
    Zimmermann, T.
    Ralbovsky, M.
    Alten, K.
    Lachinger, S.
    Petschacher, M.
    [J]. LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 200 - 207
  • [7] Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases
    Molinari, Laura
    Haezendonck, Elvira
    Mabillard, Vincent
    [J]. TRANSPORT POLICY, 2023, 134 : 167 - 179
  • [8] Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects
    Cantarelli, C. C.
    van Wee, B.
    Molin, E. J. E.
    Flyvbjerg, B.
    [J]. TRANSPORT POLICY, 2012, 22 : 88 - 95
  • [9] Risk Assessment in Sustainable Infrastructure Development Projects: A Tool for Mitigating Cost Overruns
    Canesi, Rubina
    Gallo, Beatrice
    [J]. LAND, 2024, 13 (01)
  • [10] Life-Cycle Cost Approach to Infrastructure Cost Calculation and Allocation
    Liedtke, Gernot
    Scholz, Aaron B.
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2121) : 13 - 21