On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects

被引:24
|
作者
Cavalieri, Marina [1 ]
Cristaudo, Rossana [2 ]
Guccio, Calogero [1 ]
机构
[1] Univ Catania, Dept Econ & Business, Corso Italia 55, I-95129 Catania, Italy
[2] Univ Messina, Management & Stat, Messina, Italy
关键词
Cost overruns; Project life-cycle; Transport infrastructure; Roads; Italy; EMPIRICAL-EVIDENCE; FRONT-END; PERFORMANCE; DETERMINANTS; PROCUREMENT; CORRUPTION; EXECUTION;
D O I
10.1016/j.tranpol.2019.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
The cost performance of infrastructure projects is a serious problem worldwide. This paper aims to analyse the generating process of cost overruns along the various phases of the project life-cycle. To this purpose, we employ a large dataset of Italian transport infrastructure projects for roads, started and completed during the period 2000-2013. Applying the same methodology used by the construction management research, we breakdown the various phases of the project life-cycle as well as the related cost items (estimated or actual) to analyse empirically the role of each phase in the overall evolution of cost overruns. Specifically, we pay particular attention to the costs for the physical execution of the work, distinguishing them from all other costs. The results show that Italian public infrastructure works suffer from significant cost overruns in the execution phase. However, the Italian contracting authorities seem to systematically overestimate the size of the final costs for the physical realization of the work. This risk aversion attitude is more relevant when considering financial coverage (rather than budget) and it is likely to leave room for opportunistic behaviours in the execution phase. In terms of policy implications, our results suggest the adoption of more stringent (and objective) criteria to assess the project budget and to provide its financial coverage.
引用
收藏
页码:21 / 36
页数:16
相关论文
共 50 条
  • [31] Life-Cycle Assessment of Cooperative Vehicle-Infrastructure Systems
    Park, Byungkyu
    Malakorn, Kristin
    [J]. TRANSPORTATION RESEARCH RECORD, 2013, (2381) : 101 - 109
  • [32] VALIDATING A PROJECT LIFE-CYCLE REVIEW FRAMEWORK FOR MINING PROJECTS AT EXXARO
    Steenkamp, J. R.
    Bekker, M. C.
    [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 29 (01): : 74 - 85
  • [33] Developing a Life-cycle Costing Analysis Model for Sustainable Highway Infrastructure Projects
    Jay, Yang
    Kai, Chen Goh
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2460 - 2465
  • [34] A framework for life-cycle cost assessment of composites in construction
    Hastak, M
    Mirmiran, A
    Richard, D
    [J]. JOURNAL OF REINFORCED PLASTICS AND COMPOSITES, 2003, 22 (15) : 1409 - 1430
  • [35] Risk-based life-cycle cost analysis of privatized infrastructure
    Osman, H
    [J]. MANAGEMENT AND PUBLIC POLICY 2005, 2005, (1924): : 192 - 196
  • [36] Life-cycle cost analysis for an incremental seismic rehabilitation project
    Loa, Gustavo
    Munoz, Alejandro
    Santa-Cruz, Sandra
    [J]. EARTHQUAKE SPECTRA, 2021, 37 (04) : 2840 - 2856
  • [37] Risk Factors Analysis in Whole Life-Cycle Cost of Civil Infrastructure
    Chen, Xiang
    Xue, Xiaolong
    Xi, Yuze
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 946 - 949
  • [38] Integrated life-cycle costs analysis and life-cycle assessment model for decision making of construction project
    Gu Yu-rong
    Chang Yuan
    Liu Yi-qun
    [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 448 - +
  • [39] Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
    Saxe, Shoshanna
    Guven, Gursans
    Pereira, Lucas
    Arrigoni, Alessandro
    Opher, Tamar
    Roy, Adrien
    Arceo, Aldrick
    Von Raesfeld, Sofia Sampedro
    Duhamel, Mel
    McCabe, Brenda
    Panesar, Daman K.
    MacLean, Heather L.
    Posen, I. Daniel
    [J]. ENVIRONMENTAL RESEARCH LETTERS, 2020, 15 (08)
  • [40] Risk identification and assessment in PPP infrastructure projects using fuzzy analytical hierarchy process and life-cycle methodology
    Li, Jie
    Zou, Patrick X. W.
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2008, 8 (01):