Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong

被引:49
|
作者
Huo, Tengfei [1 ]
Ren, Hong [1 ]
Cai, Weiguang [1 ]
Shen, Geoffrey Qiping [2 ]
Liu, Bingsheng [3 ]
Zhu, Minglei [1 ]
Wu, Hengqin [3 ]
机构
[1] Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400044, Peoples R China
[2] Tianjin Univ, Sch Management & Econ, Tianjin 300072, Peoples R China
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
关键词
Cost overruns; Megainfrastructure projects; Characteristics; Dependence analysis; Hong Kong; PUBLIC-WORKS PROJECTS; CONSTRUCTION PROJECTS; BID EVALUATION; DECISION; PERFORMANCE; ESCALATION; DELAYS;
D O I
10.1061/(ASCE)CO.1943-7862.0001444
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates the characteristics of the cost performance of megatransport infrastructure projects in Hong Kong and performs dependence analysis of cost overruns. It is based on 57 samples of road, rail, bridge, and tunnel projects over the period of 1985-2015 and pursues the following two objectives: (1)it measures the characteristics of cost overruns in Hong Kong megatransport infrastructure projects using case data and statistical analysis method; and (2)it examines three independent explanatory variables (i.e.,project type, size of the project, and length of the project implementation period) and their statistical relationship with cost overruns to determine whether there exist differences between Hong Kong infrastructure projects and the worldwide findings. The results indicate that, in Hong Kong, projects on average have a cost escalation of 39.18% and the average cost overrun is 34.83% for rail, 32.52% for road projects, and 37.48% for fixed-link (i.e.,bridges and tunnels) projects. The year of the decision to build has no effect on cost escalation. The major findings concerning the dependence of cost escalations are as follows. In terms of project type, rail projects are most prone to cost increase, followed by fixed-links, whereas road projects are the least vulnerable to cost escalations. Cost overruns have no significant relationship with project size, but for road projects, smaller scale projects tend to be more prone to larger cost overruns. The cost overruns strongly depend on the length of the implementation phase; cost escalations increase 1.35% with each additional year of preconstruction period. This indicates that the preconstruction phase length can be viewed as a better indicator of cost escalations compared to the construction length. This can be an essential contribution to the existing literature on cost overruns as the stage in which the infrastructures are most prone to cost escalations is considerably narrowed down. The practical implications of this study are that decision makers should focus on this period and pay more attention to delays and longer preconstruction phases if they want to determine the causes and solutions of cost overruns. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Embodied energy and carbon emissions: A case study of an infrastructure project in Hong Kong
    Wong, Andy K. L.
    HKIE Transactions Hong Kong Institution of Engineers, 2010, 17 (04): : 79 - 87
  • [22] Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
    Cantarelli, C. C.
    Molin, E. J. E.
    van Wee, B.
    Flyvbjerg, B.
    TRANSPORT POLICY, 2012, 22 : 49 - 56
  • [23] COST ESCALATION, SCHEDULE OVERRUNS AND QUALITY SHORTFALLS ON CONSTRUCTION PROJECTS: THE CASE OF ZAMBIA
    Muya, Mundia
    Kaliba, Chabota
    Sichombo, Balimu
    Shakantu, Winston
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (01) : 53 - 68
  • [24] Exploring Sustainable Operations Management in Major Infrastructure Projects: The Case of the Hong Kong-Zhuhai-Macao Bridge
    Luo, Ting
    Xue, Xiaolong
    Zhang, Minggong
    PROJECT MANAGEMENT JOURNAL, 2024, 55 (01) : 102 - 122
  • [25] ANALYSIS AND DEVELOPMENT OF A MODEL FOR THE CAUSES OF COST AND TIME OVERRUNS IN ENGINEERING PROJECTS
    Masood, Syed Athar
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [26] Coupling and evolution mechanism of infrastructure mega-projects complex ecosystem: Case study on Hong Kong-Zhuhai-Macao Bridge
    Zebin ZHAO
    Xiaolong XUE
    Xinglin GAO
    Gang LIU
    Hengqin WU
    Frontiers of Engineering Management, 2018, (01) : 17 - 29
  • [27] Supplier development and its incentives in infrastructure mega-projects: A case study on Hong Kong-Zhuhai-Macao Bridge project
    Zeng, Wei
    Zhang, Jinwen
    Wang, Hongwei
    Zhou, Hongtao
    FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (01) : 88 - 97
  • [28] Coupling and evolution mechanism of infrastructure mega-projects complex ecosystem: Case study on Hong Kong-Zhuhai-Macao Bridge
    Zhao, Zebin
    Xue, Xiaolong
    Gao, Xinglin
    Liu, Gang
    Wu, Hengqin
    FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (01) : 17 - 29
  • [29] Supplier development and its incentives in infrastructure mega-projects: A case study on Hong Kong-Zhuhai-Macao Bridge project
    Wei ZENG
    Jinwen ZHANG
    Hongwei WANG
    Hongtao ZHOU
    Frontiers of Engineering Management, 2018, (01) : 88 - 97
  • [30] Coupling and evolution mechanism of infrastructure mega-projects complex ecosystem: Case study on Hong Kong-Zhuhai-Macao Bridge
    Zebin ZHAO
    Xiaolong XUE
    Xinglin GAO
    Gang LIU
    Hengqin WU
    Frontiers of Engineering Management, 2018, 5 (01) : 17 - 29