An improved method for HV substation lightning performance estimation

被引:6
|
作者
Stojkovic, Z [1 ]
机构
[1] Univ Belgrade, Fac Elect Engn, YU-11001 Belgrade, Yugoslavia
关键词
HV substation; lightning; transformer insulation failure;
D O I
10.1109/61.772334
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper presents a statistical approach to the high-voltage substation lightning performance estimation. The method involves the monthly distribution of the lightning discharges to the lines, determined according to the line geometry and thunder activity, as well as the monthly probability distribution of the substation configurations. The mean time between failure of the power transformer insulations is estimated for a 400 kV / 110 kV transformer substation. The paper provides the analysis of the results obtained for various dispositions, number and place of positioning the surge arresters, as well as the power transformer basic insulation level. The improved procedure of the lightning performance estimation can contribute to a more economical substation design.
引用
收藏
页码:917 / 922
页数:6
相关论文
共 50 条