Cantilever Construction Optimization of Cable-stayed Bridge with Hybrid Bridge Deck System and Building Materials in Civil Engineering

被引:1
|
作者
Dai Yuwen [1 ,2 ]
Wang Youyuan [2 ]
Li Zhixue [2 ]
机构
[1] S China Univ Technol, Guangzhou, Guangdong, Peoples R China
[2] CCCC Forth Harbor Engn Co LTD, Engn Technol Res Co LTD, Shanghai, Peoples R China
关键词
Orthotropic steel deck system; Composite beam deck system; Hybrid bridge deck system; Cable-stayed bridge; Building materials;
D O I
10.4028/www.scientific.net/AMR.568.107
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the basic characteristics of the hybrid bridge deck system made up of two building materials include orthotropic steel deck system and the composite beam deck system, and the problem of excessive horizontal displacement on the bridge tow in cantilever construction as the different weight of the steel bridge deck panel and concrete one. Based on the self-balancing and self-anchoring principle of cable-stayed bridge, two optimizing methods of that adding weight or bridge deck paving after main beam enclosing, were proposed. Numerical simulation of the conventional construction procedure of Beijiang Bridge in Guizhou-Guangzhou Railway was carried out compared with the optimizing procedures proposed. The results show that the max horizontal displacement on the bridge tow is 12.5 cm in the construction period of normal procedure of cantilever construction, which is about 2 cm with the optimizing procedures proposed. Cantilever construction optimization eliminates the hidden dangers by excessive horizontal displacement of the bridge tow, and put forwards a reasonable construction program.
引用
收藏
页码:107 / +
页数:2
相关论文
共 50 条
  • [21] A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction
    Yu, Xiang-min
    Chen, De-wei
    Bai, Zhi-zhou
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1717 - 1724
  • [22] Research on Reasonable Construction Plan for Cast-in-Place UHPC Bridge Deck Plate of Cable-Stayed Bridge
    Shi, Jintao
    Chen, Zhijiang
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (15):
  • [23] A study on a hybrid system of cable-stayed prestressed concrete bridge and steel suspension bridge
    Takemura, H
    Ohura, T
    Onushi, M
    Tanabe, T
    [J]. STRAIT CROSSINGS 2001, 2001, : 61 - 66
  • [24] An experimental approach on aerodynamic stability of a cable-stayed cantilever bridge
    Yoshizumi, F
    Inoue, H
    [J]. JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2002, 90 (12-15) : 2099 - 2111
  • [25] Applications of Grey System Theory to Construction Control of Cable-Stayed Bridge
    Wu, Fangwen
    Xue, Chengfeng
    [J]. ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2502 - 2506
  • [26] Design and construction of a launched cable-stayed bridge in China
    Wang, Yingliang
    Dai, Xiaochun
    He, Tingguo
    Dai, Jianbing
    Zhang, Jiachun
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (05) : 3 - 8
  • [27] Monitoring of the Alamillo cable-stayed bridge during construction
    J. R. Casas
    A. C. Aparicio
    [J]. Experimental Mechanics, 1998, 38 : 24 - 28
  • [28] Construction and Geometry Control of Incheon Cable-Stayed Bridge
    Yang, Jong-Ho
    Im, Duk-Ki
    Kim, Chang-Hyun
    Ahn, Sang-Sup
    Lee, Wan-Soo
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 49 - 52
  • [29] VIBRATION MEASUREMENTS ON A CABLE-STAYED BRIDGE UNDER CONSTRUCTION
    HIRSCH, G
    RUSCHEWEYH, H
    [J]. JOURNAL OF INDUSTRIAL AERODYNAMICS, 1976, 1 (03): : 297 - 300
  • [30] Monitoring of the Alamillo cable-stayed bridge during construction
    Casas, JR
    Aparicio, AC
    [J]. EXPERIMENTAL MECHANICS, 1998, 38 (01) : 24 - 28