共 50 条
- [31] Review on Cable Force Optimization Method for Cable-stayed Bridge in Completed Bridge State [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (05): : 17 - 37
- [32] Optimum tensioning in construction state of cable-stayed bridge [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2002, 15 (02):
- [36] Dynamic investigation of a hybrid suspension and cable-stayed bridge [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2000, 29 (05): : 731 - 739
- [37] Experimental study of fatigue on orthotropic steel deck of cable-stayed bridge [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (06): : 1071 - 1082
- [38] Numerical analysis on stochastic buffeting of cable-stayed bridge with slotted deck [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (08): : 98 - 106
- [39] Deck construction equipment for the Constitucion de 1812 cable-stayed Bridge over the Cadiz Bay [J]. HORMIGON Y ACERO, 2016, 67 (278): : 173 - 183