Offsite construction: Developing a BIM-Based optimizer for assembly

被引:99
|
作者
Gbadamosi, Abdul-Quayyum [1 ,2 ]
Mahamadu, Abdul-Majeed [1 ]
Oyedele, Lukumon O. [2 ]
Akinade, Olugbenga O. [2 ]
Manu, Patrick [3 ]
Mahdjoubi, Lamine [1 ]
Aigbavboa, Clinton [4 ]
机构
[1] Univ West England, Ctr Architecture & Built Environm Res, Bristol BS16 1QY, Avon, England
[2] Univ West England, Big Data Analyt Lab, Bristol BS16 1QY, Avon, England
[3] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester M13 9PL, Lancs, England
[4] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
关键词
Assembly; Efficiency; DFMA; Lean construction; Building; ANALYTIC HIERARCHY PROCESS; ASSESSMENT SCORE; DESIGN; METHODOLOGY;
D O I
10.1016/j.jclepro.2019.01.113
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The lack of adequate consideration of the underlying factors affecting the methods of building assembly often results in inefficiencies in the uses of building materials, equipment and manpower. These inefficiencies are further compounded by the nature of the construction industry, which traditionally involves complex processes that result in wastages during production. To address this problem, this study integrates the principles of Design for Manufacture and Assembly (DFMA) and Lean Construction to develop a design assessment and optimization system to assist designers in the selection of alternative building design elements and materials in a building information model. This assessment and optimization system rely on metrics derived from production data associated with the ease of assembling, ease of handling, the speed of assembling and the wastage during assembly or construction of a building element or material. This paper presents the development of BIM-OfA assessment logic and its application for assessment and optimal selection of building envelop through the extension of Building Information Modelling (BIM). The system demonstrates its adequacy as an indicator of construction and material efficiency, its integration with BIM further enhances the practicality of using production data such weight of components, number of on-site workers and number of parts, for buildability assessment to improve efficiency and reduce waste. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1180 / 1190
页数:11
相关论文
共 50 条
  • [31] Research on BIM-based Construction Project Organization Interface Management
    Liu, Honglei
    Wang, Guangbin
    Zhang, Lei
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2781 - 2784
  • [32] BIM-based construction technology life-cycle management
    Zhang, L. D.
    Wang, G. J.
    2015 3RD INTERNATIONAL CONFERENCE ON SOFT COMPUTING IN INFORMATION COMMUNICATION TECHNOLOGY (SCICT 2015), 2015, : 3 - 5
  • [33] Collaboration barriers in BIM-based construction networks: A conceptual model
    Oraee, Mehran
    Hosseini, M. Reza
    Edwards, David J.
    Li, Heng
    Papadonikolaki, Eleni
    Cao, Dongping
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (06) : 839 - 854
  • [34] BIM-Based Visualization Research in the Construction Industry: A Network Analysis
    Wu, Zezhou
    Chen, Changhong
    Cai, Yuzhu
    Lu, Chen
    Wang, Hao
    Yu, Tao
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (18)
  • [35] BIM-Based Resource Tradeoff in Project Scheduling Using Fire Hawk Optimizer (FHO)
    Shishehgarkhaneh, Milad Baghalzadeh
    Azizi, Mandi
    Bashi, Mahla
    Moehler, Robert C.
    BUILDINGS, 2022, 12 (09)
  • [36] Promotion of the Application of BIM in China-A BIM-Based Model for Construction Material Recycling
    Zhang, Kefei
    Jia, Jing
    RECYCLING, 2021, 6 (01) : 1 - 11
  • [37] BIM-based preassembly analysis for design for manufacturing and assembly of prefabricated bridges
    Nguyen, Duy-Cuong
    Jeon, Chi -Ho
    Roh, Gitae
    Shim, Chang-su
    AUTOMATION IN CONSTRUCTION, 2024, 160
  • [38] BIM-based framework of automatic tunnel segment assembly and deviation control
    Gong, Jian
    Bao, Tengfei
    Zhu, Zheng
    Yu, Hong
    Li, Yangtao
    UNDERGROUND SPACE, 2024, 16 : 59 - 78
  • [39] BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule
    Chen, Xinyang
    Zhu, Yifan
    Chen, Hainan
    Ouyang, Yewei
    Luo, Xiaowei
    Wu, Xiaoling
    AUTOMATION IN CONSTRUCTION, 2021, 130
  • [40] BIM-based method calculation of auxiliary materials required in housing construction
    Wei, Haitao
    Zheng, Shunyi
    Zhao, Like
    Huang, Rongyong
    AUTOMATION IN CONSTRUCTION, 2017, 78 : 62 - 82