Offsite construction: Developing a BIM-Based optimizer for assembly

被引:99
|
作者
Gbadamosi, Abdul-Quayyum [1 ,2 ]
Mahamadu, Abdul-Majeed [1 ]
Oyedele, Lukumon O. [2 ]
Akinade, Olugbenga O. [2 ]
Manu, Patrick [3 ]
Mahdjoubi, Lamine [1 ]
Aigbavboa, Clinton [4 ]
机构
[1] Univ West England, Ctr Architecture & Built Environm Res, Bristol BS16 1QY, Avon, England
[2] Univ West England, Big Data Analyt Lab, Bristol BS16 1QY, Avon, England
[3] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester M13 9PL, Lancs, England
[4] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
关键词
Assembly; Efficiency; DFMA; Lean construction; Building; ANALYTIC HIERARCHY PROCESS; ASSESSMENT SCORE; DESIGN; METHODOLOGY;
D O I
10.1016/j.jclepro.2019.01.113
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The lack of adequate consideration of the underlying factors affecting the methods of building assembly often results in inefficiencies in the uses of building materials, equipment and manpower. These inefficiencies are further compounded by the nature of the construction industry, which traditionally involves complex processes that result in wastages during production. To address this problem, this study integrates the principles of Design for Manufacture and Assembly (DFMA) and Lean Construction to develop a design assessment and optimization system to assist designers in the selection of alternative building design elements and materials in a building information model. This assessment and optimization system rely on metrics derived from production data associated with the ease of assembling, ease of handling, the speed of assembling and the wastage during assembly or construction of a building element or material. This paper presents the development of BIM-OfA assessment logic and its application for assessment and optimal selection of building envelop through the extension of Building Information Modelling (BIM). The system demonstrates its adequacy as an indicator of construction and material efficiency, its integration with BIM further enhances the practicality of using production data such weight of components, number of on-site workers and number of parts, for buildability assessment to improve efficiency and reduce waste. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1180 / 1190
页数:11
相关论文
共 50 条
  • [21] Contractual challenges for BIM-based construction projects: a systematic review
    Abd Jamil, Ahmad Huzaimi
    Fathi, Mohamad Syazli
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (04) : 372 - 385
  • [22] Scientometric analysis of BIM-based research in construction engineering and management
    Jin, Ruoyu
    Zou, Yang
    Gidado, Kassim
    Ashton, Phillip
    Painting, Noel
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (08) : 1750 - 1776
  • [23] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854
  • [24] Research on BIM-based construction domain text information management
    Jiang, Shaohua
    Zhang, Haiyan
    Dalian, Jian Zhang
    Journal of Networks, 2013, 8 (06) : 1455 - 1464
  • [25] BIM-Based Automated Drainage System Design in Prefabrication Construction
    Zhang, Nan
    Tian, Yichen
    Wang, Jingwen
    Al-Hussein, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1146 - 1155
  • [26] Development and application of BIM-based highway construction management platform
    Fu, Q.
    Zhang, L. W.
    Xie, M. W.
    He, X. D.
    ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 875 - 878
  • [27] BIM-based Collaborative Schedule Management System for the Construction Industry
    Hou, Xue-liang
    Lin, Zhi-ming
    2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 957 - 962
  • [28] A BIM-based carbon footprinting of earthworks in road construction process
    Lou, Baowen
    Rasmussen, Freja Nygaard
    Degago, Samson Abate
    Juvik, Eivind Schnell
    Bohne, Rolf Andre
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2025, 110
  • [29] DIGITALIZATION AND PROCUREMENT IN CONSTRUCTION PROJECTS: AN INTEGRATED BIM-BASED APPROACH
    Matos, Bruno C.
    Cruz, Carlos O.
    Branco, Fernando B.
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 : 400 - 423
  • [30] Advantages and Implementation Steps of BIM-based Construction Project Management
    Li, Xiang
    Cao, Lei
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 441 - 444