Bridge bored pile construction management and accident treatment

被引:0
|
作者
Zhang, Yonghong [1 ]
Tang, Lijun [2 ]
Wang, Ning [3 ]
机构
[1] Huaihai Inst Technol, Dept Civil Engn, Lianyungang 222005, Peoples R China
[2] CCCC First Harbor Engn Co LTD, Engn Co LTD 4, Tianjin 300456, Peoples R China
[3] CCCC First Harbor Engn Co LTD, Engn Co LTD 2, Qingdao 266071, Peoples R China
关键词
Bored pile; construction management; accident treatment;
D O I
10.4028/www.scientific.net/AMM.357-360.1535
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to improve the construction quality of bridge bored pile, combined with the construction experience of the bored pile, bored pile construction management from two aspects and accident treatment are analyzed in detail, gives the method of many useful suggestions and accident treatment, for your reference.
引用
收藏
页码:1535 / +
页数:2
相关论文
共 50 条
  • [21] AUGER BORED TECHNOLOGY OF UNDERWATER PILE CONSTRUCTION NEAR THE EXISTING RAILWAY
    Guo, Dongchen
    Lei, Junqing
    Zhang, Yao
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 385 - +
  • [22] Characterize concrete demand in bored-pile construction through simulation
    Lu, M
    Ying, KC
    ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1705 - 1712
  • [23] Influence of Benoto bored pile construction on nearby existing tunnel: A case study
    Gao, Guoyao
    Zhuang, Yan
    Wang, Kangyu
    Chen, Liang
    SOILS AND FOUNDATIONS, 2019, 59 (02) : 544 - 555
  • [24] Research on groundwater pollution brought out by leachate of municipal refuse in bored pile construction
    Yang Ming-liang
    Yao Hai-lin
    Heng Qi-ling
    Luo Xing-wen
    ROCK AND SOIL MECHANICS, 2005, 26 (04) : 586 - 590
  • [25] Study on Zero Discharge Treatment Technology of Waste Bored Pile Slurry
    Zhang, Zhong-miao
    Fang, Kai
    Luo, Jia-cheng
    Liu, Xing-wang
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 1355 - +
  • [26] Case Studies on Environmental Emissions of Machinery and Material Use due to Bored Pile Construction
    Perera, W. D. C.
    Karunaratne, S. C. S.
    Peiris, T. S. G.
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2025, 58 (01): : 139 - 148
  • [27] Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA
    Wang Jiujun
    ADVANCED MATERIALS AND PROCESSES III, PTS 1 AND 2, 2013, 395-396 : 473 - 476
  • [28] Bored pile foundation at great Depths
    不详
    BAUINGENIEUR, 2014, 89 : A12 - A12
  • [29] Key techniques for construction of bored piles of Pier Z4 of main bridge of Jiangshun Bridge
    Hu, Y. (amalshv_hyll@126.com), 1600, Wuhan Bridge Research Institute (43):
  • [30] Bored pile foundations in offshore conditions
    Ellman, Roderic A., Jr.
    Rhyner, Frederick C.
    DEEP FOUNDATIONS ON BORED AND AUGER PILES, PROCEEDINGS, 2009, : 47 - 58