共 50 条
- [21] AUGER BORED TECHNOLOGY OF UNDERWATER PILE CONSTRUCTION NEAR THE EXISTING RAILWAY NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 385 - +
- [22] Characterize concrete demand in bored-pile construction through simulation ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1705 - 1712
- [25] Study on Zero Discharge Treatment Technology of Waste Bored Pile Slurry ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 1355 - +
- [26] Case Studies on Environmental Emissions of Machinery and Material Use due to Bored Pile Construction ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2025, 58 (01): : 139 - 148
- [27] Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA ADVANCED MATERIALS AND PROCESSES III, PTS 1 AND 2, 2013, 395-396 : 473 - 476
- [29] Key techniques for construction of bored piles of Pier Z4 of main bridge of Jiangshun Bridge Hu, Y. (amalshv_hyll@126.com), 1600, Wuhan Bridge Research Institute (43):
- [30] Bored pile foundations in offshore conditions DEEP FOUNDATIONS ON BORED AND AUGER PILES, PROCEEDINGS, 2009, : 47 - 58