共 50 条
- [31] The construction accident of the outer Maximilian bridge in Munich. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1904, 48 (38): : 1407 - 1411
- [33] Experimental study on treatment of waste slurry in cast-in-situ bored pile Shuili Xuebao/Journal of Hydraulic Engineering, 2015, 46 : 40 - 45
- [34] Research on Construction Technology of cast-in-situ bored pile under Complex Geological Conditions 2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
- [38] Deepwater Pile Foundation Construction Technology of Xiaoyi Reservoir Bridge PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 252 - 255
- [39] DEM analysis of pile installation effect: comparing a bored and a driven pile Granular Matter, 2018, 20
- [40] Bored Pile Settlement Analysis of Pile End Grouting in Civil Engineering ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING, 2012, 568 : 99 - +