Influence of Benoto bored pile construction on nearby existing tunnel: A case study

被引:12
|
作者
Gao, Guoyao [1 ,2 ]
Zhuang, Yan [1 ,3 ]
Wang, Kangyu [4 ]
Chen, Liang [5 ]
机构
[1] Southeast Univ, Sch Civil Engn, Key Lab RC & PRC Struct, Educ Minist, 2 Sipailou, Nanjing 210096, Jiangsu, Peoples R China
[2] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Gansu, Peoples R China
[3] Changsha Univ Sci & Technol, Natl Engn Lab Highway Maintenance Technol, Changsha 410114, Hunan, Peoples R China
[4] Zhejiang Univ Technol, Sch Civil Engn & Architecture, Hangzhou 310014, Zhejiang, Peoples R China
[5] Hohai Univ, Geotech Res Inst, Key Lab, Minist Educ Geomech & Embankment Engn, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Lateral displacement; Benoto bored piles; Existing tunnel; Construction technology; Case study; INFLUENCE ZONES; ADJACENT; INSTALLATION; DISTURBANCE; SIMULATION;
D O I
10.1016/j.sandf.2018.11.006
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The monitoring and analysis of lateral displacement for metro tunnels are very important because the metro systems are the lifeline of metropolises. This paper presents a case study of a site in Nanjing, China, where the Benoto bored piles were constructed nearby the existing tunnel. The construction technology, a combination of the Benoto bored piles construction and the conventional construction technology of circulating slurry, is illustrated in detail. The lateral displacement at six test sections were measured and discussed to assess the impact of piles installation on the stability and integrity of the existing tunnel. The measured results showed that during the construction period using the Benoto method, relatively large lateral displacement occurred at the depth with soft soil (Mucky silty clay), with characteristics including a large void ratio, high plasticity, poor permeability, high water content, low shear strength, and low modulus of deformation. During the construction period of the conventional Circulating-Slurry method, negative lateral displacement occurred below the tip of the casing due to the soil arching effect, indicating an inward movement towards the Benoto bored piles. The maximum lateral displacement decreased as the distance between piles and inclinometers increased, with a maximum difference of 45% at the end of the measurements. It was also observed that the measured maximum lateral displacement was less than the cumulative trigger value of 20 mm, indicating an effectiveness of Benoto bored piles constructed adjacent to existing tunnel. This case study may provide the means for a qualitative assessment for engineering constructions where the situation bears similarities. (C) 2019 Production and hosting by Elsevier B.V. on behalf of The Japanese Geotechnical Society.
引用
收藏
页码:544 / 555
页数:12
相关论文
共 50 条
  • [1] Study on the influence of bored pile excavation on the adjacent existing bridge
    Ge, Peng
    Huang, Fanglin
    Wen, Weibin
    Feng, Fan
    He, Bin
    [J]. Journal of Railway Science and Engineering, 2020, 17 (12) : 3111 - 3117
  • [2] Influence of bored subway tunnel construction on the deformation of existing pipelines and control techniques
    Gao, Bingli
    [J]. Modern Tunnelling Technology, 2014, 51 (04) : 96 - 101
  • [3] The influence of bored piles on existing tunnels - A case study
    Schroeder, Felix
    [J]. Ground Engineering, 2002, 35 (07): : 32 - 34
  • [4] AUGER BORED TECHNOLOGY OF UNDERWATER PILE CONSTRUCTION NEAR THE EXISTING RAILWAY
    Guo, Dongchen
    Lei, Junqing
    Zhang, Yao
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 385 - +
  • [5] Monitoring-Based Assessment of the Construction Influence of Benoto Pile on Adjacent High-Speed Railway Bridge: Case Study
    Zhang, Y. M.
    Wang, H.
    Mao, J. X.
    Wang, F. Q.
    Hu, S. T.
    Zhao, X. X.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (01)
  • [6] Safety Evaluation of Existing Tunnel Nearby Driving Pile Using Two Different Standards
    Fall, Massamba
    Gao, Zhengguo
    Ndiaye, Becaye Cissokho
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (03)
  • [7] Case Study of an Underpinning Pile Foundation for an Interval Tunnel Crossing an Existing Bridge
    Zhou, Yuhang
    Liu, Yuanming
    Chen, Qingzhi
    Ou, Xun
    Li, Yingxiao
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (24):
  • [8] Influence of Underpinning Pile Drilling Construction on the Bearing Behavior of Existing Loaded Foundation Piles: Case Study
    Shan, Hua-feng
    Xia, Tang-dai
    Yu, Feng
    Tao, Hai-bing
    He, Shao-heng
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [9] Analytical Theoretical Study on the Influence of Shield Tunnel Construction on Pile Foundation
    盾构隧道施工对桩基影响的解析理论研究
    [J]. Qin, Dongping, 1600, Editorial Department of Journal of Railway Engineering Society (38):
  • [10] Study on the Influence of Close Distance Construction of Urban Tunnel on the Existing Station
    Zheng, Yang
    Wu, Ke
    Sun, Jie
    Chen, Rong
    Li, Yameng
    Yang, Shifeng
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (07) : 4765 - 4780