Integrated scheduling of crane handling and truck transportation in a maritime container terminal

被引:141
|
作者
Chen, Lu [1 ]
Langevin, Andre [2 ,3 ]
Lu, Zhiqiang [4 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Ecole Polytech, Dept Math & Genie Ind, Montreal, PQ H3C 3A7, Canada
[3] CIRRELT, Montreal, PQ H3C 3A7, Canada
[4] Tongji Univ, Sch Mech Engn, Shanghai 201804, Peoples R China
基金
中国国家自然科学基金; 加拿大自然科学与工程研究理事会;
关键词
Scheduling; Container terminal; Container handling; Constraint programming; Disjunctive graph; MANUFACTURING ACTIVITIES; OPERATIONS-RESEARCH; ROUTING ALGORITHM; MACHINES; SYSTEMS; TIME; TRANSSHIPMENT; OPTIMIZATION; DEPLOYMENT;
D O I
10.1016/j.ejor.2012.09.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the interactions between crane handling and truck transportation in a maritime container terminal by addressing them simultaneously. Yard trucks are shared among different ships, which helps to reduce empty truck trips in the terminal area. The problem is formulated as a constraint programming model and a three-stage algorithm is developed. At the first stage, crane schedules are generated by a heuristic method. At the second stage, the multiple-truck routing problem is solved based on the precedence relations of the transportation tasks derived from the first stage. At the last stage a complete solution is constructed by using a disjunctive graph. The three procedures are linked by an iterative structure, which facilitates the search for a good solution. The computational results indicate that the three-stage algorithm is effective for finding high-quality solutions and can efficiently solve large problems. (C) 2012 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:142 / 152
页数:11
相关论文
共 50 条
  • [41] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 665 - 682
  • [42] Integrated scheduling of handling equipment at automated container terminals
    Henry Y. K. Lau
    Ying Zhao
    Annals of Operations Research, 2008, 159 : 373 - 394
  • [43] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 373 - 394
  • [44] Scheduling yard crane in a port container terminal using genetic algorithm
    Ng, W. C.
    Mak, K. L.
    Tsang, W. S.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2006, 13 (03): : 246 - 253
  • [45] Research on coupling scheduling of quay crane dispatch and configuration in the container terminal
    Liang, Chengji
    Fan, Lubin
    Xu, Dehong
    Ding, Yi
    Gen, Mitsuo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 649 - 657
  • [46] A fuzzy model for scheduling equipments handling outbound container in terminal
    Zhou, Pengfei
    Kang, Haigui
    Lin, Li
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7267 - 7271
  • [47] An approximation algorithm for quay crane scheduling with handling priority in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (12) : 1151 - 1161
  • [48] Integrated quay crane and yard truck scheduling for unloading inbound containers
    Kaveshgar, Narges
    Nathan Huynh
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 : 168 - 177
  • [49] Rail Mounted Gantry Crane Scheduling In Rail-Truck Transshipment Terminal
    Wang, Li
    Zhu, Xiaoning
    Xie, Zhengyu
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2016, 22 (01): : 61 - 73
  • [50] Scheduling of container-handling equipment during the loading process at an automated container terminal
    Luo, Jiabin
    Wu, Yue
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149