Scheduling yard crane in a port container terminal using genetic algorithm

被引:0
|
作者
Ng, W. C. [1 ]
Mak, K. L. [1 ]
Tsang, W. S. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
yard crane scheduling; genetic algorithm; container terminal;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is well known that yard operation is the heart of the entire terminal as the efficiency of yard operations determines that of the overall terminal operations. To achieve smooth flow of containers in a yard, yard cranes need to be positioned at the right location at the right time to pickup containers from or load containers onto trucks. This research studies the problem of scheduling a yard crane to perform a given set of container handling jobs with different ready times to minimize the sum of job waiting times. It is shown that the problem is NP-complete. An algorithm is developed to find a lower bound for the optimal solution of the scheduling problem and genetic algorithm (GA) approach is proposed to find an effective yard crane schedule. Five popular crossover schemes are considered in this paper. The performance of GA with the five crossover schemes are evaluated on a comprehensive set of test problems which are randomly generated based on realistic yard operations data. The computational results show that the GA approach can indeed find effective solutions for the scheduling problem. Significance: The current practice of scheduling yard came in port container terminals often lead to trucks queuing up at yard blocks. The paper proposes to use GA approach to find an effective yard crane schedule to reduce the sum of truck waiting times.
引用
收藏
页码:246 / 253
页数:8
相关论文
共 50 条
  • [1] Yard crane scheduling in container terminal using Genetic Algorithm
    Yang, Yang
    Gen, Mistuo
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 180 - 190
  • [2] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    [J]. APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276
  • [3] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [4] An efficient approach for solving yard crane scheduling in a container terminal
    He J.-L.
    Zhang W.-M.
    Huang Y.-F.
    Yan W.
    [J]. Journal of Shanghai Jiaotong University (Science), 2013, 18 (5) : 606 - 619
  • [5] An Efcient Approach for Solving Yard Crane Scheduling in a Container Terminal
    何军良
    张为民
    黄有方
    严伟
    [J]. Journal of Shanghai Jiaotong University(Science), 2013, 18 (05) : 606 - 619
  • [6] On the Optimization of Yard Crane Scheduling in a Container Terminal Based on GATS
    Hu Yanhong
    Sun Junqing
    Han Mei
    Liu Fenglian
    Yang Peng
    Feng Meiling
    [J]. PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 5473 - 5477
  • [7] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [8] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    [J]. Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [9] Scheduling Yard Cranes in a Container Terminal Using a New Genetic Approach
    Mak, K. L.
    Sun, D.
    [J]. ENGINEERING LETTERS, 2009, 17 (04)
  • [10] A hybrid parallel genetic algorithm for yard crane scheduling
    He, Junliang
    Chang, Daofang
    Mi, Weijian
    Yan, Wei
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (01) : 136 - 155