Integrated scheduling of crane handling and truck transportation in a maritime container terminal

被引:142
|
作者
Chen, Lu [1 ]
Langevin, Andre [2 ,3 ]
Lu, Zhiqiang [4 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Ecole Polytech, Dept Math & Genie Ind, Montreal, PQ H3C 3A7, Canada
[3] CIRRELT, Montreal, PQ H3C 3A7, Canada
[4] Tongji Univ, Sch Mech Engn, Shanghai 201804, Peoples R China
基金
中国国家自然科学基金; 加拿大自然科学与工程研究理事会;
关键词
Scheduling; Container terminal; Container handling; Constraint programming; Disjunctive graph; MANUFACTURING ACTIVITIES; OPERATIONS-RESEARCH; ROUTING ALGORITHM; MACHINES; SYSTEMS; TIME; TRANSSHIPMENT; OPTIMIZATION; DEPLOYMENT;
D O I
10.1016/j.ejor.2012.09.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the interactions between crane handling and truck transportation in a maritime container terminal by addressing them simultaneously. Yard trucks are shared among different ships, which helps to reduce empty truck trips in the terminal area. The problem is formulated as a constraint programming model and a three-stage algorithm is developed. At the first stage, crane schedules are generated by a heuristic method. At the second stage, the multiple-truck routing problem is solved based on the precedence relations of the transportation tasks derived from the first stage. At the last stage a complete solution is constructed by using a disjunctive graph. The three procedures are linked by an iterative structure, which facilitates the search for a good solution. The computational results indicate that the three-stage algorithm is effective for finding high-quality solutions and can efficiently solve large problems. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:142 / 152
页数:11
相关论文
共 50 条
  • [31] A multiple-crane-constrained scheduling problem in a container terminal
    Bish, EK
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 144 (01) : 83 - 107
  • [32] Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminals
    曹瑾鑫
    史其信
    Der-Horng Lee
    [J]. Tsinghua Science and Technology, 2010, 15 (04) : 467 - 474
  • [33] Yard crane scheduling in container terminal using Genetic Algorithm
    Yang, Yang
    Gen, Mistuo
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 180 - 190
  • [34] A fuzzy vehicle-crane scheduling problem in container terminal
    Zhou, Pengfel
    Guo, Zijian
    Lin, Li
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3593 - 3598
  • [35] Integrated scheduling of yard cranes, external trucks, and internal trucks in maritime container terminal operation
    Gao, Yunfeng
    Ge, Ying-En
    [J]. MARITIME POLICY & MANAGEMENT, 2023, 50 (05) : 629 - 650
  • [36] CONTAINER HANDLING CRANE.
    Poore, R.R.
    Atcheson, M.G.A.
    [J]. New Zealand Engineering, 1975, 30 (03): : 73 - 78
  • [37] Integrated operation models with quay crane maintenance in a container terminal
    Wang, Tingsong
    Gao, Guangxu
    Wang, Kai
    Shi, Jia
    [J]. OCEAN & COASTAL MANAGEMENT, 2024, 251
  • [38] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    [J]. APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [39] WIRELESS INTER-CRANE COMMUNICATION METHOD FOR MULTI-CRANE SCHEDULING IN MARITIME CONTAINER TERMINALS
    Cerneckyte, M.
    Kurmis, M.
    Andziulis, A.
    Gaigals, G.
    [J]. LATVIAN JOURNAL OF PHYSICS AND TECHNICAL SCIENCES, 2013, 50 (05) : 13 - 19
  • [40] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 665 - 682