Comparing procurement methods for design-build projects

被引:112
|
作者
El Wardani, MA [1 ]
Messner, JI [1 ]
Horman, MJ [1 ]
机构
[1] Penn State Univ, Dept Architectural Engn, University Pk, PA 16802 USA
关键词
delivery; design/build; construction industry; procurement;
D O I
10.1061/(ASCE)0733-9364(2006)132:3(230)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals.
引用
收藏
页码:230 / 238
页数:9
相关论文
共 50 条
  • [21] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [22] A SYNTHESIS OF BEST-VALUE PROCUREMENT PRACTICES FOR SUSTAINABLE DESIGN-BUILD PROJECTS IN THE PUBLIC SECTOR
    Molenaar, Keith R.
    Sobin, Nathaniel
    Antillon, Eric I.
    [J]. JOURNAL OF GREEN BUILDING, 2010, 5 (04): : 148 - 157
  • [24] Impact of Design Risk on the Performance of Design-Build Projects
    Liu, Junying
    Xie, Qunxia
    Xia, Bo
    Bridge, Adrian J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [25] Risk allocation in design-build and BOT projects
    Nielsen, KR
    [J]. CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53
  • [26] Key Challenges in Megabridge Design-Build Project Procurement
    Moran, Raymond M.
    Odeh, Ibrahim
    Ashuri, Baabak
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [27] Time and Cost Performance of Design-Build Projects
    Chen, Qing
    Jin, Zhigang
    Xia, Bo
    Wu, Peng
    Skitmore, Martin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [28] The role of modelling and simulation in design-build projects
    Orsoni, Alessandra
    Karadimas, Nikolaos V.
    [J]. 20TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2006: MODELLING METHODOLOGIES AND SIMULATION: KEY TECHNOLOGIES IN ACADEMIA AND INDUSTRY, 2006, : 315 - +
  • [29] Benchmarking of large design-build highway projects
    Shrestha, Pramen Prasad
    Migilaccio, Giovanni Ciro
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (1994) : 17 - 25
  • [30] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)