Project Acceleration via Activity Crashing, Overlapping, and Substitution

被引:51
|
作者
Vinhaes Gerk, Jose Eduardo
Qassim, Raad Yahya
机构
关键词
Project acceleration; project planning; time-cost tradeoff;
D O I
10.1109/TEM.2008.927786
中图分类号
F [经济];
学科分类号
02 ;
摘要
It is an established fact that projects are almost always behind schedule. Consequently, there is a great need for the allocation of additional resources with a view to accelerating projects, so as to ensure delivery on the planned date. These resources are obtained from project budget contingency, whose purpose is to foresee and budget for delays arising from disruptions, inaccurate activity time and cost estimates, and resource nonavailability when required for the execution of project activities. This type of problem arises both in the planning phase of a project, particularly in the context of bidding, as well as in ongoing projects, including new product development projects. The research reported in this paper provides a mixed-integer nonlinear programming model for the acceleration of projects, employing the simultaneous crashing, overlapping, and substitution of project activities. In order to ensure convergence, this model is transformed exactly into a mixed-integer linear programming model. The assumptions of the model are presented and discussed with engineering project management practice in mind. Application of the model to four examples of different sizes and nature, three of which are practical cases, demonstrates the efficiency of the model, implemented in commercial optimization software, in solving practical project acceleration problems.
引用
收藏
页码:590 / 601
页数:12
相关论文
共 50 条
  • [1] Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: a case study of Huoshengshan and Leishenshan Hospital projects in Wuhan
    Lu, Hui
    Wang, Hongwei
    Yu, Dihua
    Ye, Jian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (08) : 3696 - 3712
  • [2] Concurrent crashing and overlapping in product development
    Roemer, TA
    Ahmadi, R
    [J]. OPERATIONS RESEARCH, 2004, 52 (04) : 606 - 622
  • [3] Fuzzy activity times in critical path and project crashing problems
    Liu, ST
    [J]. CYBERNETICS AND SYSTEMS, 2003, 34 (02) : 161 - 172
  • [4] Activity modes selection for project crashing through deterministic simulation
    Mohanty, Ashok
    Mishra, Jibitesh
    Satpathy, Biswajit
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2011, 4 (04): : 610 - 623
  • [5] Optimization of Project Schedule Crashing
    Shrestha, Kabindra K.
    Shrestha, Pramen P.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 708 - 717
  • [6] A stochastic branch-and-bound approach to activity crashing in project management
    Gutjahr, WJ
    Strauss, C
    Wagner, E
    [J]. INFORMS JOURNAL ON COMPUTING, 2000, 12 (02) : 125 - 135
  • [7] RESOURCE CONSTRAINED PROJECT CRASHING
    DECKRO, RF
    HEBERT, JE
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1989, 17 (01): : 69 - 79
  • [8] Reinforcement Learning for Resource Constrained Project Scheduling Problem with Activity Iterations and Crashing
    Sung, Inkyung
    Choi, Bongjun
    Nielsen, Peter
    [J]. IFAC PAPERSONLINE, 2020, 53 (02): : 10493 - 10497
  • [9] Design and evaluation of the project and program crashing games
    Rumeser, David
    Emsley, Margaret
    [J]. JOURNAL OF APPLIED RESEARCH IN HIGHER EDUCATION, 2022, 14 (01) : 471 - 488
  • [10] Crashing Construction Project Schedules by Relocating Resources
    Tomczak, Michal
    Jaskowski, Piotr
    [J]. IEEE ACCESS, 2020, 8 : 224522 - 224531