Project Acceleration via Activity Crashing, Overlapping, and Substitution

被引:51
|
作者
Vinhaes Gerk, Jose Eduardo
Qassim, Raad Yahya
机构
关键词
Project acceleration; project planning; time-cost tradeoff;
D O I
10.1109/TEM.2008.927786
中图分类号
F [经济];
学科分类号
02 ;
摘要
It is an established fact that projects are almost always behind schedule. Consequently, there is a great need for the allocation of additional resources with a view to accelerating projects, so as to ensure delivery on the planned date. These resources are obtained from project budget contingency, whose purpose is to foresee and budget for delays arising from disruptions, inaccurate activity time and cost estimates, and resource nonavailability when required for the execution of project activities. This type of problem arises both in the planning phase of a project, particularly in the context of bidding, as well as in ongoing projects, including new product development projects. The research reported in this paper provides a mixed-integer nonlinear programming model for the acceleration of projects, employing the simultaneous crashing, overlapping, and substitution of project activities. In order to ensure convergence, this model is transformed exactly into a mixed-integer linear programming model. The assumptions of the model are presented and discussed with engineering project management practice in mind. Application of the model to four examples of different sizes and nature, three of which are practical cases, demonstrates the efficiency of the model, implemented in commercial optimization software, in solving practical project acceleration problems.
引用
收藏
页码:590 / 601
页数:12
相关论文
共 50 条
  • [21] Solution of fuzzy multi-objective project crashing problem
    Tolunay Göçken
    [J]. Neural Computing and Applications, 2013, 23 : 2167 - 2175
  • [22] Solution of fuzzy multi-objective project crashing problem
    Gocken, Tolunay
    [J]. NEURAL COMPUTING & APPLICATIONS, 2013, 23 (7-8): : 2167 - 2175
  • [23] A Hybrid Approach for Project Crashing Optimization Strategy with Risk Consideration: A Case Study for an EPC Project
    Ou-Yang, Chao
    Chen, Wang-Li
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [24] Application of fuzzy linear programming to project crashing decisions with fuzzy variables
    Liang, Tien-Fu
    Cheng, Hung-Wen
    Chen, Ping-Yen
    Shen, Kuan-Hsinung
    [J]. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2008, 11 (03): : 499 - 516
  • [25] A trapezoidal intuitionistic fuzzy optimization approach for crashing a budget constrained project
    Kasimoglu, Fatih
    Bayeg, Selami
    Pinar, Adem
    Utku, Durdu Hakan
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (04)
  • [26] Nature-inspired metaheuristics for multiobjective activity crashing
    Doerner, K. F.
    Gutjahr, W. J.
    Hartl, R. F.
    Strauss, C.
    Stummer, C.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (06): : 1019 - 1037
  • [27] THE RATE OF MUTANT SUBSTITUTION IN POPULATIONS WITH OVERLAPPING GENERATIONS
    POLLAK, E
    [J]. GENETICS RESEARCH, 1982, 40 (01) : 89 - 94
  • [28] A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION
    Kuhl, Michael E.
    Tolentino-Pena, Radhames A.
    [J]. 2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2370 - 2376
  • [29] Agile-similar Approach in Traditional Project Management A Generalisation of the Crashing Model
    Kuchta, Dorota
    L'Ebraly, Pierrick
    Ptaszynska, Ewa
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 1 (ICEIS), 2016, : 318 - 326
  • [30] Target-based project crashing problem by adaptive distributionally robust optimization
    Li, Yuanbo
    Cui, Zheng
    Shen, Houcai
    Zhang, Lianmin
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157