Study on Zero Discharge Treatment Technology of Waste Bored Pile Slurry

被引:2
|
作者
Zhang, Zhong-miao [1 ]
Fang, Kai [1 ]
Luo, Jia-cheng [2 ]
Liu, Xing-wang [3 ]
机构
[1] Zhejiang Univ, Inst Geotech Engn, Hangzhou 310058, Zhejiang, Peoples R China
[2] Wenzhou South Zhejiang Geolog Engn Co Ltd, Wenzhou 325006, Peoples R China
[3] Zhejiang Prov Inst, Architectural Design & Res, Hangzhou 310006, Peoples R China
来源
关键词
slurry; pressure filtration; bored pile; zero discharge;
D O I
10.4028/www.scientific.net/AMR.261-263.1355
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction wastes have attracted more and more public attention with the development of the city construction. On the basis of summarizing the existing slurry treatment technologies in relevant. area, a new slurry treatment process is proposed according to the characteristics of waste bored pile slurry. Three steps included in this process: slurry purification, flocculation and pressure filtration. A practical application is used to demonstrate the feasibility of this process. The results show that the slurry is disposed without pollution, achieving zero discharge of pollutants.
引用
收藏
页码:1355 / +
页数:2
相关论文
共 50 条
  • [41] Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA
    Wang Jiujun
    ADVANCED MATERIALS AND PROCESSES III, PTS 1 AND 2, 2013, 395-396 : 473 - 476
  • [42] Parametric study of deformation behavior of bored pile on a thin bearing layer
    Matsui, Tamotsu
    Oda, Kazuhiro
    Proceedings of the International Conference on Computer Methods and Advances in Geomechanics, 1991,
  • [43] Zero Waste Technology of Soybeans Processing
    Szulc, Joanna
    Blaszak, Blazej
    Wenda-Piesik, Anna
    Gozdecka, Grazyna
    Zary-Sikorska, Ewa
    Bak, Malgorzata
    Bauza-Kaszewska, Justyna
    SUSTAINABILITY, 2023, 15 (20)
  • [44] Reinforcing design and construction technology of large-diameter artificial bored pile segregation accident
    Shao, Guang-Biao
    Sun, Jian-Ping
    Jiang, Zong-Bao
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (SUPPL. 2): : 260 - 264
  • [45] Research on Construction Technology of cast-in-situ bored pile under Complex Geological Conditions
    Wu, Y. H.
    Zhou, Z.
    Chen, W. Q.
    Liu, S. Y.
    Zhang, B. C.
    Huang, H. F.
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [46] A new technology of marble slurry waste utilisation in roads
    Misra, A. K.
    Mathur, Renu
    Rao, Y. V.
    Singh, A. P.
    Goel, Pankaj
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2010, 69 (01): : 67 - 72
  • [47] Model test on detection of intercalated mud bored pile using optical fiber sensing technology
    Lei Wen-kai
    Xiao Heng-lin
    Zhang Jin-tuan
    Liu Yong-li
    Fan Meng
    ROCK AND SOIL MECHANICS, 2018, 39 (03) : 909 - 916
  • [48] Influence of Benoto bored pile construction on nearby existing tunnel: A case study
    Gao, Guoyao
    Zhuang, Yan
    Wang, Kangyu
    Chen, Liang
    SOILS AND FOUNDATIONS, 2019, 59 (02) : 544 - 555
  • [49] Experimental study of effects of pile tip post grouting on bearing characteristics of large-diameter bored pile
    Li Yong-hui
    Zhu Xiang
    Zhou Tong-he
    ROCK AND SOIL MECHANICS, 2016, 37 : 388 - 396
  • [50] Experimental study on loading mechanism of compaction-under reamed bored pile
    Cui, Jiang-Yu
    Lu, Qin
    2002, Science Press (24):