Study on Zero Discharge Treatment Technology of Waste Bored Pile Slurry

被引:2
|
作者
Zhang, Zhong-miao [1 ]
Fang, Kai [1 ]
Luo, Jia-cheng [2 ]
Liu, Xing-wang [3 ]
机构
[1] Zhejiang Univ, Inst Geotech Engn, Hangzhou 310058, Zhejiang, Peoples R China
[2] Wenzhou South Zhejiang Geolog Engn Co Ltd, Wenzhou 325006, Peoples R China
[3] Zhejiang Prov Inst, Architectural Design & Res, Hangzhou 310006, Peoples R China
来源
关键词
slurry; pressure filtration; bored pile; zero discharge;
D O I
10.4028/www.scientific.net/AMR.261-263.1355
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction wastes have attracted more and more public attention with the development of the city construction. On the basis of summarizing the existing slurry treatment technologies in relevant. area, a new slurry treatment process is proposed according to the characteristics of waste bored pile slurry. Three steps included in this process: slurry purification, flocculation and pressure filtration. A practical application is used to demonstrate the feasibility of this process. The results show that the slurry is disposed without pollution, achieving zero discharge of pollutants.
引用
收藏
页码:1355 / +
页数:2
相关论文
共 50 条
  • [21] AUGER BORED TECHNOLOGY OF UNDERWATER PILE CONSTRUCTION NEAR THE EXISTING RAILWAY
    Guo, Dongchen
    Lei, Junqing
    Zhang, Yao
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 385 - +
  • [23] Study of mechanism and application on bored pile end grouting
    Zhang, Zhongmiao
    Wu, Shiming
    Bao, Feng
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 1999, 21 (06): : 681 - 686
  • [24] Field study on uplift bearing capacity of pre-bored grouted planted pile and bored pile in deep soft soil
    Zhou, Jia-jin
    Zhang, Ri-hong
    Gong, Xiao-nan
    Yu, Jian-lin
    OCEAN ENGINEERING, 2025, 322
  • [25] ZERO DISCHARGE TREATMENT TECHNOLOGY OF PALM OIL MILL EFFLUENT
    Loh, Soh Kheang
    Lai, Mei Ee
    Ngatiman, Muzzammil
    Lim, Weng Soon
    Choo, Yuen May
    Mang, Zhenjia
    Salimon, Jumat
    JOURNAL OF OIL PALM RESEARCH, 2013, 25 (03): : 273 - 281
  • [26] Drilling technology of bored-pile in alternating layer of hard and soft rock
    Liu, Mu-Feng
    Peng, Zhen-Bin
    Wang, Jian-Jun
    Peng, Wen-Xiang
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2010, 41 (03): : 1109 - 1115
  • [27] Numerical Simulation Study on Sediment Effect of Bored Pile Tip
    Cheng, Huadong
    Duan, Junjie
    Shi, Haiyang
    Yu, Bin
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 761 - 767
  • [28] Study on the influence of bored pile excavation on the adjacent existing bridge
    Ge, Peng
    Huang, Fanglin
    Wen, Weibin
    Feng, Fan
    He, Bin
    Journal of Railway Science and Engineering, 2020, 17 (12) : 3111 - 3117
  • [29] Study on the effect of steel casing for bearing capacity of bored pile
    Li, Xiao-Yan
    Ruan, Huai-Ning
    Chen, Zhi-Jian
    Journal of Harbin Institute of Technology (New Series), 2009, 16 (SUPPL. 1) : 120 - 123
  • [30] INVESTIGATION OF THE INTERACTION OF THE BORED MICRO PILE BY DDS (FDP) TECHNOLOGY WITH THE SOIL GROUND
    Issakulov, Abilkhair
    Omarov, Abdulla
    Zhussupbekov, Askar
    Mussakhanova, Saltanat
    Issakulov, Baizak
    INTERNATIONAL JOURNAL OF GEOMATE, 2023, 24 (105): : 11 - 17