Case Study of Performance Management for PPP Projects

被引:1
|
作者
Yao, Deli [1 ]
Chen, Qiang [2 ]
机构
[1] Liaocheng Univ, Sch Architectural & Civil Engn, Liaocheng City 252059, Peoples R China
[2] Highway Adm Liaocheng City, Dept Project Plan Management, Liaocheng City, Peoples R China
关键词
Public-Private Partnerships; performance management; KPIs; case study;
D O I
10.1109/BIFE.2012.16
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As the widely usage of PPP model in the delivery of infrastructures all around the world, the performance of this procurement method is highly concerned. There have been many performance management techniques proposed in decades of practice, so this paper intended to study some of the successful cases and analyze their performance management practice, and also comparative study was conducted. Based on the framework of the European Foundation for Quality Management (EFQM) Excellence Model, this paper analyzed the Key Performance Indicators (KPIs) taken by the subject projects, and explained how could those measures can improve the performance of PPP projects. Some innovative measures are highly recommended by this paper after they have already been effectively applied and approved to be beneficial.
引用
收藏
页码:39 / 42
页数:4
相关论文
共 50 条
  • [41] A Case Study of Knowledge Management Usage in Agile Software Projects
    Cabral, Anderson Yanzer
    Ribeiro, Marcelo Blois
    Lemke, Ana Paula
    Silva, Marcos Tadeu
    Cristal, Mauricio
    Franco, Cristiano
    ENTERPRISE INFORMATION SYSTEMS-BK, 2009, 24 : 627 - 638
  • [42] Crisis Management in Information System Projects: Lessons of a Case Study
    Chartier, Anne
    Banville, Claude
    Landry, Maurice
    CANADIAN JOURNAL OF ADMINISTRATIVE SCIENCES-REVUE CANADIENNE DES SCIENCES DE L ADMINISTRATION, 2010, 27 (02): : 148 - 160
  • [43] An Exploration of Knowledge Management Practices in IT Projects: A Case Study Approach
    Barclay, Corlane
    Osei-Bryson, Kweku-Muata
    AMCIS 2010 PROCEEDINGS, 2010,
  • [44] Improving Change Management in Large Engineering Projects: A Case Study
    Santos, Joao
    Tereso, Anabela
    Santos, Claudio
    GOOD PRACTICES AND NEW PERSPECTIVES IN INFORMATION SYSTEMS AND TECHNOLOGIES, VOL 3, WORLDCIST 2024, 2024, 987 : 3 - 12
  • [45] Applying principles of change management in ergonomic projects: A case study
    Commissaris, DACM
    Schoenmaker, N
    Beune, EAT
    Eikhout, SM
    HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING, 2006, 16 (02): : 195 - 223
  • [46] Exploring the impact of stakeholder management strategies on managing issues in PPP projects
    Jayasuriya, Sajani
    Zhang, Guomin
    Yang, Rebecca J.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (06) : 666 - 678
  • [47] A life-cycle risk management framework for PPP infrastructure projects
    Zou, Patrick
    Wang, Shouqing
    Fang, Dongping
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2008, 13 (02) : 123 - +
  • [48] Developing an integrated risk management system for evaluating ppp projects in Libya
    Marzouk, M.M.
    Elhesnawi, M.O.
    Journal of Engineering and Applied Science, 2019, 66 (05): : 635 - 657
  • [49] Options-based negotiation management of PPP–BOT infrastructure projects
    Attarzadeh M.
    Chua D.K.H.
    Beer M.
    Abbott E.L.S.
    Construction Management and Economics, 2017, 35 (11-12) : 676 - 692
  • [50] Review of Management Comprehensiveness on Occupational Health and Safety for PPP Transportation Projects
    Dimitriou, Dimitrios
    Papakostas, Konstantinos
    SUSTAINABILITY, 2022, 14 (10)