Case Study of Performance Management for PPP Projects

被引:1
|
作者
Yao, Deli [1 ]
Chen, Qiang [2 ]
机构
[1] Liaocheng Univ, Sch Architectural & Civil Engn, Liaocheng City 252059, Peoples R China
[2] Highway Adm Liaocheng City, Dept Project Plan Management, Liaocheng City, Peoples R China
关键词
Public-Private Partnerships; performance management; KPIs; case study;
D O I
10.1109/BIFE.2012.16
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As the widely usage of PPP model in the delivery of infrastructures all around the world, the performance of this procurement method is highly concerned. There have been many performance management techniques proposed in decades of practice, so this paper intended to study some of the successful cases and analyze their performance management practice, and also comparative study was conducted. Based on the framework of the European Foundation for Quality Management (EFQM) Excellence Model, this paper analyzed the Key Performance Indicators (KPIs) taken by the subject projects, and explained how could those measures can improve the performance of PPP projects. Some innovative measures are highly recommended by this paper after they have already been effectively applied and approved to be beneficial.
引用
收藏
页码:39 / 42
页数:4
相关论文
共 50 条
  • [1] Developing sustainability performance evaluation indicators of PPP projects: A case study
    Sun, Q.
    Zhang, S.
    Lu, W.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 377 - 387
  • [2] Procuring authorities and project performance: a case study of PPP highway projects in India
    Nayyer, Mojahedul Islam
    Annamalai, Thillai Rajan
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (01) : 38 - 55
  • [3] PPP projects: improvements in stakeholder management
    Amadi, Chika
    Carrillo, Pat
    Tuuli, Martin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (02) : 544 - 560
  • [4] Relationship management in the management of PFI/PPP projects in the UK
    The Bartlett School of Graduate Studies, University College London, Gower Street, London, WC1E 6BT, United Kingdom
    Int. J. Proj. Manage., 2007, 3 (232-240):
  • [5] Investigating the Sustainability Performance of PPP-Type Infrastructure Projects: A Case of China
    Zheng, Shengqin
    Xu, Ke
    He, Qing
    Fang, Shaoze
    Zhang, Lin
    SUSTAINABILITY, 2018, 10 (11)
  • [6] The Management Efficiency of PPP Projects in Rural China
    Meng Weizhen
    Dou Ruwen
    Han Yu
    Wang Nannan
    2018 7TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2018), 2018, : 179 - 183
  • [7] Criteria influencing debt financing of Indian PPP road projects: a case study
    Singh, Laishram Boeing
    Kalidindi, Satyanarayana N.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (01) : 34 - +
  • [8] Increasing integration in construction projects: A case study on a PPP project adopting BIM
    Lehtinen, T.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2012, : 439 - 446
  • [9] Cumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study
    Yuan, Jingfeng
    Chan, Albert P. C.
    Xia, Bo
    Skibniewski, Miroslaw J.
    Xiong, Wei
    Ji, Chuang
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (02)
  • [10] Performance Evaluation in IST Projects: A Case Study
    Pereira, Jose Luis
    Varajao, Joao
    Oliveira e Sa, Jorge
    Silva, Antonio
    INFORMATION SYSTEMS FOR INDUSTRY 4.0, 2019, 31 : 13 - 27