Utilizing artificial intelligence to solving time - cost - quality trade-off problem

被引:10
|
作者
Pham Vu Hong Son [1 ]
Luu Ngoc Quynh Khoi [1 ]
机构
[1] Ho Chi Minh City Univ Technol HCMUT, Construct Engn & Management Dept, Vietnam Natl Univ, 268 Ly Thuong Kiet St,Dist 10, Ho Chi Minh City 700000, Vietnam
关键词
MULTIOBJECTIVE OPTIMIZATION; DIFFERENTIAL EVOLUTION; PROJECTS;
D O I
10.1038/s41598-022-24668-7
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This study presents the Slime Mold Algorithm (SMA) to solve the time-cost-quality trade-off problem in a construction project. The proposed SMA is a flexible and efficient algorithm in exploration and exploitation to reach the best optimal solution to process the input model's data. This paper aims to discuss and solve the optimization problem and compare the evaluation with other algorithms such as Opposition-based Multiple Objective Differential Evolution, Non-dominated sorting genetic algorithm, Multiple objective particle swarm optimization, Multiple objective differential evolution and Chaotic initialized multiple objective differential evolution (CAMODE) to verify the efficiency and potential of the proposed algorithm. According to the analysis results, the SMA model generated a diversification measure for case studies, producing superior outcomes to those of previous algorithms.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off
    Hajiagha, Seyed Hossein Razavi
    Akrami, Hadi
    Hashemi, Shide Sadat
    Mahdiraji, Hannan Amoozad
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
  • [42] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
    Hosny, Ossama
    Elbassuony, Mahmoud
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
  • [43] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [44] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [45] Presenting a goal programming model in the time-cost-quality trade-off
    Hamta, Nima
    Ehsanifar, Mohammad
    Sarikhani, Javad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (01) : 1 - 11
  • [46] Project Time-Cost-Quality Trade-off Problem: A Novel Approach Based on Fuzzy Decision Making
    Keshavarz, Esmaeil
    Shoul, Abbas
    INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2020, 28 (04) : 545 - 567
  • [47] A Multi-objective Stochastic Programming Approach for Project Time, Cost and Quality Trade-off Problem (TCQTP)
    Ahadian, Behrooz
    Veisy, Omid
    Azizi, Vahid
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (04) : 553 - 563
  • [48] Solving multi-mode time-cost-quality trade-off problems under generalized precedence relations
    Khalili-Damghani, Kaveh
    Tavana, Madjid
    Abtahi, Amir-Reza
    Santos Arteaga, Francisco J.
    OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (05): : 965 - 1001
  • [49] Trade-off model among time, quality and cost for business process reengineering
    Zhou, Yong-Hua
    Chen, Yu-Liu
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2002, 8 (04): : 269 - 273
  • [50] Solving the Thermoelectric Trade-Off Problem with Metallic Carbon Nanotubes
    Ichinose, Yota
    Yoshida, Akari
    Horiuchi, Kanako
    Fukuhara, Kengo
    Komatsu, Natsumi
    Gao, Weilu
    Yomogida, Yohei
    Matsubara, Manaho
    Yamamoto, Takahiro
    Kono, Junichiro
    Yanagi, Kazuhiro
    NANO LETTERS, 2019, 19 (10) : 7370 - 7376