The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations

被引:36
|
作者
Luis Ponz-Tienda, Jose [1 ]
Pellicer, Eugenio [2 ]
Benlloch-Marco, Javier [3 ]
Andres-Romano, Carlos [4 ]
机构
[1] Univ Los Andes, Dept Civil & Environm Engn, Bogota, Colombia
[2] Univ Politecn Valencia, Sch Civil Engn, Valencia 46022, Spain
[3] Univ Politecn Valencia, Dept Architectural Construct, Valencia 46022, Spain
[4] Univ Politecn Valencia, Dept Business Adm, Valencia 46022, Spain
关键词
NEURAL DYNAMICS MODEL; ACTIVITY NETWORKS; MANAGEMENT; OPTIMIZATION; COST; TIME; CRITICALITY; SIMULATION; VARIABLES; NUMBERS;
D O I
10.1111/mice.12166
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In scheduling, estimations are affected by the imprecision of limited information on future events, and the reduction in the number and level of detail of activities. Overlapping of processes and activities requires the study of their continuity, along with analysis of the risks associated with imprecision. In this line, this article proposes a fuzzy heuristic model for the Project Scheduling Problem with flows and minimal feeding, time and work Generalized Precedence Relations with a realistic approach to overlapping, in which the continuity of processes and activities is allowed in a discretionary way. This fuzzy algorithm handles the balance of process flows, and computes the optimal fragmentation of tasks, avoiding the interruption of the critical path and reverse criticality. The goodness of this approach is tested on several problems found in the literature; furthermore, an example of a 15-story building was used to compare the better performance of the algorithm implemented in Visual Basic for Applications (Excel) over that same example input in Primavera (c) P6 Professional V8.2.0, using five different scenarios.
引用
收藏
页码:872 / 891
页数:20
相关论文
共 50 条
  • [1] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556
  • [2] A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
    Bianco, Lucio
    Caramia, Massimiliano
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 14 - 20
  • [3] A Branch and Bound Algorithm for the Weighted Earliness-Tardiness Project Scheduling Problem with Generalized Precedence Relations
    Nadjafi, B. Afshar
    Shadrokh, S.
    SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2009, 16 (01): : 55 - 64
  • [4] A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (01) : 152 - 174
  • [5] A Branch and Bound algorithm for the Weighted Earliness-Tardiness Project Scheduling Problem with Generalized Precedence Relations
    Afshar Nadjafi, B.
    Shadrokh, S.
    Scientia Iranica, 2009, 16 (1 E) : 55 - 64
  • [6] An Improved Cuckoo Search Algorithm for Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Jin, Yidong
    Nie, Hui
    Duan, Pengfei
    Yang, Huihua
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 1086 - 1090
  • [7] A kind of scheduling problem with fuzzy delays under mixed precedence relations
    Xie Yuan
    Xie Jian-ying
    Liu Jun
    Proceedings of 2005 Chinese Control and Decision Conference, Vols 1 and 2, 2005, : 1801 - 1804
  • [8] Project scheduling with generalized precedence relations: A new method to analyze criticalities and flexibilities
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 298 (02) : 451 - 462
  • [9] Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Su, Zhi-Xiong
    Wei, Han-Ying
    Zou, Xin
    Qi, Jian-Xun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (03)
  • [10] A New Formulation of the Resource-Unconstrained Project Scheduling Problem with Generalized Precedence Relations to Minimize the Completion Time
    Bianco, Lucio
    Caramia, Massimiliano
    NETWORKS, 2010, 56 (04) : 263 - 271