共 50 条
- [41] Feasibility Study of Mining No.13 Coal Seam in Guxian Coalfield in China with Longwall Top Coal Caving [J]. 3RD INTERNATIONAL WORKSHOP ON MINE HAZARDS PREVENTION AND CONTROL, 2013, 94 : 297 - 302
- [42] Height of water-conducting zone in longwall top-coal caving mining under thick alluvium and soft overburden [J]. Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (11): : 3308 - 3316
- [45] Structure coupling between hydraulic roof support and surrounding rock in extra-thick and hard coal seam with super large cutting height and longwall top coal caving operation [J]. Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (06): : 1666 - 1678
- [46] Study on evolution law of overburden fracture in fully-mechanized top-coal caving face with large mining height in thick coal seam [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (03): : 1 - 12
- [47] Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring [J]. Rock Mechanics and Rock Engineering, 2017, 50 : 507 - 511
- [48] Prevention and control for coal spontaneous combustionin by fully mechanized top-coal caving of extremely thick coal seam [J]. MINE HAZARDS PREVENTION AND CONTROL TECHNOLOGY, 2007, : 186 - 191