Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring

被引:83
|
作者
Yu, Bin [1 ]
Zhao, Jun [1 ,2 ]
Xiao, Hongtian [3 ]
机构
[1] Datong Coal Mine Grp Co Ltd, Datong 037003, Peoples R China
[2] Shandong Univ Sci & Technol, Coll Min & Safety Engn, Qingdao 266590, Peoples R China
[3] Shandong Univ Sci & Technol, Coll Civil Engn & Architecture, Qingdao 266590, Peoples R China
关键词
Super-thick coal seam; Longwall top coal caving; Microseismic monitoring; Medium-strong strata; Overburden failures; HEIGHT; STRATA; SEAM;
D O I
10.1007/s00603-016-1096-8
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
[No abstract available]
引用
下载
收藏
页码:507 / 511
页数:5
相关论文
共 50 条
  • [1] Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring
    Bin Yu
    Jun Zhao
    Hongtian Xiao
    Rock Mechanics and Rock Engineering, 2017, 50 : 507 - 511
  • [2] Structure and deformation measurements of shallow overburden during top coal caving longwall mining
    Li Sheng
    Fan Chaojun
    Luo Mingkun
    Yang Zhenhua
    Lan Tianwei
    Zhang Haifeng
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2017, 27 (06) : 1081 - 1085
  • [3] Structure and deformation measurements of shallow overburden during top coal caving longwall mining
    Li Sheng
    Fan Chaojun
    Luo Mingkun
    Yang Zhenhua
    Lan Tianwei
    Zhang Haifeng
    International Journal of Mining Science and Technology, 2017, 27 (06) : 1081 - 1085
  • [4] Hydraulic fracturing of hard top coal and roof for controlling gas during the initial mining stages in longwall top coal caving: a case study
    Huang, Bingxiang
    Cheng, Qingying
    Zhao, Xinglong
    Kang, Chao
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2018, 15 (06) : 2492 - 2506
  • [5] A Study on the Fracturing Height of Overburden Strata of Coal Face based on Microseismic Monitoring
    Guo, Xiu-Jie
    Zhang, Ming
    Yang, Yong-Jie
    Wang, Min
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3702 - +
  • [6] Longwall Top-Coal Caving Mechanism and Cavability Optimization with Hydraulic Fracturing in Thick Coal Seam: A Case Study
    Wang, Zhaohui
    Tang, Yuesong
    Gong, Hao
    ENERGIES, 2021, 14 (16)
  • [7] Effect of Key Parameters on Top Coal First Caving and Roof First Weighting in Longwall Top Coal Caving: A Case Study
    Le, Tien Dung
    Bui, Xuan Nam
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2020, 20 (05)
  • [8] In situ investigations into overburden failures of a super-thick coal seam for longwall top coal caving
    Yu, Bin
    Zhao, Jun
    Kuang, Tiejun
    Meng, Xiangbin
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 78 : 155 - 162
  • [9] Theoretical and Experimental Investigation on Top Coal Drawing Mechanism Considering Overburden Pressures in Longwall Top-coal Caving
    Jinwang Zhang
    Yipeng Zhang
    Shengli Yang
    Dongliang Cheng
    Weijie Wei
    Liu Yang
    Rock Mechanics and Rock Engineering, 2025, 58 (3) : 2901 - 2927
  • [10] Using hydraulic fracturing to control caving of the hanging roof during the initial mining stages in a longwall coal mine: a case study
    Bingxiang Huang
    Qingying Cheng
    Xinglong Zhao
    Weichao Xue
    Malcolm Scoble
    Arabian Journal of Geosciences, 2018, 11