共 50 条
- [2] The Schedule Control of Nuclear Power Construction Phase of Project Approval and Administrative Licensing ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 2995 - +
- [3] Network Comprehensive Optimization for Schedule and Cost in Project Construction Based on PSO Algorithm 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1260 - 1264
- [5] The Establishment of Prophase Innovative Management System in Nuclear Power Project CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3040 - 3043
- [6] The researches on the optimization of overall construction schedule for railway project PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 182 - 186
- [7] Fuzzy optimization of construction engineering project schedule based on critical chain management Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [8] Optimization for limited resource schedule in public construction project FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1639 - 1643
- [9] Research on risk analysis for construction project schedule based on flexible network simulation Proceedings of the 2006 International Conference on Management Science & Engineering (13th), Vols 1-3, 2006, : 2098 - 2103
- [10] Radiation protection risk control method of nuclear power project based on sequence optimization 2020 5TH INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING, 2020, 571