共 50 条
- [1] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861
- [2] Agent-Based Modeling and Simulation of Project Schedule Risk Analysis in the Construction Industry [J]. PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 493 - 511
- [3] Construction project network evaluation with correlated schedule risk analysis model [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (01): : 49 - 63
- [4] Risk Analysis of Construction Schedule Based on PERT and MC Simulation [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 150 - +
- [5] Risk Analysis of Construction Schedule Based on Monte Carlo Simulation [J]. 2009 INTERNATIONAL SYMPOSIUM ON COMPUTER NETWORK AND MULTIMEDIA TECHNOLOGY (CNMT 2009), VOLUMES 1 AND 2, 2009, : 48 - +
- [6] Research on Risk Management Organization of Subway Construction Project Based on Social Network Analysis [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018), 2018, 151 : 464 - 468
- [8] Research on Construction Project Organization Based on Social Network Analysis [J]. Wireless Personal Communications, 2018, 102 : 1867 - 1877
- [9] Research on Risk Manage of Power Construction Project Based on Bayesian Network [J]. INTELLIGENT COMPUTING AND INFORMATION SCIENCE, PT II, 2011, 135 : 128 - 134
- [10] Research on Organization Network Model for Construction Project based on Social Network Analysis [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2001 - 2005