Research on risk analysis for construction project schedule based on flexible network simulation

被引:0
|
作者
Zhong Zuo-wei [1 ]
Xi Bao [1 ]
Huang Qiu-guo [1 ]
Li Fang-zhen [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
关键词
activity critical index(ACI); flexible network simulation; Monte Carlo method; path float use; schedule risk; SWARM platform;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Construction projects are complex in nature and have many inherent uncertainties. These uncertainties have a very significant effect on project. The flexible network simulation based on SWARM platform is applied to study the construction project schedule risk in this-research, which makes lots of improves to the current model. Differing from the traditional PERT network planning considering only single critical path, this research introduces the uncertainties to the simulation duration and critical path. Then the statistical analysis is adopted to decide the simulation running times, and the completion probability and risk degree will be obtained after that. In addition, the model identify the high risk working procedure according to the activity critical index(ACI), what is more important is that the new method computing safe use rate of path float. The case study indicates that the method can provide more information about construction management to decision-makers and managers who can predominate project risk as a whole.
引用
收藏
页码:2098 / 2103
页数:6
相关论文
共 50 条
  • [1] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation
    Zhong Zuowei
    Xi Bao
    Huang Qiugu
    Yang Shihua
    Li Fangzhen
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861
  • [2] Agent-Based Modeling and Simulation of Project Schedule Risk Analysis in the Construction Industry
    ElGindi, Mohamed
    Harb, Sara
    Abdullah, Abdelhamid
    Essawy, Yasmeen A. S.
    Nassar, Khaled
    [J]. PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 493 - 511
  • [3] Construction project network evaluation with correlated schedule risk analysis model
    Okmen, Onder
    Oztas, Ahmet
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (01): : 49 - 63
  • [4] Risk Analysis of Construction Schedule Based on PERT and MC Simulation
    Huang Jian-wen
    Wang Xing-xia
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 150 - +
  • [5] Risk Analysis of Construction Schedule Based on Monte Carlo Simulation
    Wang Xing-xia
    Huang Jian-wen
    [J]. 2009 INTERNATIONAL SYMPOSIUM ON COMPUTER NETWORK AND MULTIMEDIA TECHNOLOGY (CNMT 2009), VOLUMES 1 AND 2, 2009, : 48 - +
  • [6] Research on Risk Management Organization of Subway Construction Project Based on Social Network Analysis
    Yuan, Chao
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018), 2018, 151 : 464 - 468
  • [7] Research on Construction Project Organization Based on Social Network Analysis
    Zhang, Songyan
    Fang, Yuxiao
    [J]. WIRELESS PERSONAL COMMUNICATIONS, 2018, 102 (02) : 1867 - 1877
  • [8] Research on Construction Project Organization Based on Social Network Analysis
    Songyan Zhang
    Yuxiao Fang
    [J]. Wireless Personal Communications, 2018, 102 : 1867 - 1877
  • [9] Research on Risk Manage of Power Construction Project Based on Bayesian Network
    Jia, Zhengyuan
    Fan, Zhou
    Li, Yong
    [J]. INTELLIGENT COMPUTING AND INFORMATION SCIENCE, PT II, 2011, 135 : 128 - 134
  • [10] Research on Organization Network Model for Construction Project based on Social Network Analysis
    Yang Lin
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2001 - 2005