Fuzzy optimization of construction engineering project schedule based on critical chain management

被引:0
|
作者
机构
[1] [1,Liu, Jianbing
[2] Ren, Hong
[3] Du, Junshu
来源
Liu, J. (Liujb71@sina.cn) | 2013年 / Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia卷 / 11期
关键词
Chains - Highway bridges - Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Critical chain management was the very important theory innovation in the development of construction project schedule management field in recent years. Compared with the traditional methods of construction project schedule management, the methods of critical chain management considered resource constraints into construction project schedule management, the construction project cycle was shortened and the efficiency was enhanced by using the dynamic thinking and circulation pattern to manage whole project. In view of the progress of critical chain management of the article, fuzzy theory was used to calculate and optimize the buffer zone sizes with the determination of the buffer size of the existing resources in certain critical chain management so as to shorten the cycle. © 2013 Universitas Ahmad Dahlan.
引用
收藏
相关论文
共 50 条
  • [1] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD
    Yu, Lianghui
    Jia, Ling
    Zhou, Dandan
    [J]. ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273
  • [2] Application research on the critical chain technology in engineering project schedule management
    Zhang, Ai-Lin
    Wang, Li-Xia
    [J]. Information Technology Journal, 2013, 12 (17) : 4196 - 4199
  • [3] Schedule management method of warships multi-project parallel construction based on critical chain and hybrid optimization algorithm
    Gong J.
    Hu T.
    Liu S.
    [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2020, 42 (08): : 1784 - 1793
  • [4] Fuzzy-critical-chain-based project management
    Chen, Ming-Kuen
    Hsu, Shin-Peng
    [J]. Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (02): : 167 - 176
  • [5] Design of Construction project schedule optimization system based on cost optimization and management
    Yuan, Xiaoxi
    [J]. Journal of Commercial Biotechnology, 2022, 27 (01) : 64 - 75
  • [6] Critical chain, project schedule management based on Bayesian Network model
    College of Economics and Management, Tongji University, Shanghai
    200092, China
    [J]. Tongji Daxue Xuebao, 10 (1606-1612):
  • [7] Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm
    Yu, Xiaobing
    Zuo, Hengzhong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [8] Research on Software Project Schedule Based on Critical Chain
    Xu Huihua
    Wan Li
    Xue Song
    [J]. 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
  • [9] Management Integration of Engineering Project Supply Chain Based on Lean Construction
    Shi Jiangang
    Wu Guangdong
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 387 - 390
  • [10] Integrated management and optimization of construction project schedule, cost and quality
    Zhan Xiaran
    [J]. 2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625