共 50 条
- [41] Fuzzy Duration Estimation and Buffer Sizing Method for Critical Chain Project Management 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, MSE 2015, 2015, : 168 - 176
- [42] The Risk Management Method for Project Schedule of Aerospace Engineering ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 3165 - +
- [43] Fuzzy Critical Chain Method Based on Genetic Algorithm for Project Scheduling INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 877 - 892
- [44] Scheduling evaluation in construction projects using the critical chain project management method INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
- [45] Digitalization of construction engineering project management based on the digital twin Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2024, 57 (07): : 106 - 128
- [46] Information Integration of Engineering Construction Project Based on Management Process PROCEEDINGS OF THE 2015 4TH NATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING ( NCEECE 2015), 2016, 47 : 1135 - 1140
- [47] Research of Cost Management of Construction Project Based on Value Chain INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1382 - 1384
- [48] Supply chain management in construction project PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 1018 - 1021
- [49] The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network PROCEEDINGS OF THE 2015 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING SCIENCE AND ENGINEERING, 2016, 32 : 248 - 255
- [50] The review of project management based on the theory of constraints and critical chain ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3424 - +