共 50 条
- [21] Schedule Collaborative Optimization for the Engineering Project Based on Stackelberg ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 64 - 71
- [23] Method to control construction schedule based on FDP Harbin Gongye Daxue Xuebao, 2008, 12 (2068-2071):
- [24] Dynamic safety evaluation based on project network schedule PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 1922 - 1926
- [25] Dynamic safety evaluating based on project network schedule Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology, 2002, 24 (02):
- [26] SCHEDULE-AND-PROCESS MANAGEMENT IN CONSTRUCTION OF A NUCLEAR POWER PLANT. American Society of Civil Engineers, Engineering Issues, Journal of Professional Activities, 1974, 16 (04): : 120 - 128
- [29] Prediction of Construction Schedule Based on BP Neural Network PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3423 - +
- [30] Study on Schedule Control in AP1000 Nuclear Plant Project PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 181 - 186