Study on Schedule Control in AP1000 Nuclear Plant Project

被引:0
|
作者
Fang Xiaopeng [1 ]
机构
[1] SNPEC, Shanghai 200233, Peoples R China
关键词
Schedule Control; Modular Construction; Construction Logics;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support.
引用
收藏
页码:181 / 186
页数:6
相关论文
共 50 条
  • [1] Study on HSE Management system of AP1000 Nuclear Plant Project
    He Xiaogang
    Fang Xiaopeng
    Wei Zhong
    Yang Yanli
    Sun Zhiyou
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 2, 2011, : 385 - 390
  • [2] Lifting Operation Safety Management in AP1000 Nuclear Plant Project
    He Xiaogang
    Shortes, Shell
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
  • [3] The AP1000 Plant and the China Project Commissioning Success
    Friedman, Bryan N.
    [J]. JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2019, 5 (01):
  • [4] ATWS accident analysis for AP1000 nuclear power plant
    Chen, Wenhu
    Cai, Wei
    Ge, Zhenzhen
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (SUPPL.1): : 161 - 165
  • [5] Schedule management of nuclear island design of first kind of AP1000 unit
    [J]. Liu, Xiaoheng, 1600, Atomic Energy Press (35):
  • [6] The Summary and Research on Nuclear Island Construction and Erection Cost Management of AP1000 Nuclear Power Plant Project
    Yan, Zhaoyong
    [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 941 - 953
  • [7] Precooling Study on FCD Concrete Aggregate in Haiyang AP1000 Nuclear Power Project
    Wang, Shufeng
    Cong, Jiuyuan
    Li, Dayong
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1274 - +
  • [8] New nuclear options - The AP1000
    Kasper, Ken
    [J]. HEALTH PHYSICS, 2006, 90 (06): : 519 - 520
  • [9] PASSIVE SAFETY SYSTEMS OF ADVANCED NUCLEAR POWER PLANT: AP1000
    Yan, Guohua
    Ye, Chen
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 85 - 89
  • [10] Risk Analysis and Control Strategies for the Assembly of Major Structure Module in AP1000 Nuclear Power Project
    Hu, Tiezhu
    Wang, Xiangnyu
    [J]. INTERNATIONAL YOUTH NUCLEAR CONGRESS 2016, IYNC2016, 2017, 127 : 187 - 192