共 50 条
- [1] Study on Schedule Control in AP1000 Nuclear Plant Project [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 181 - 186
- [2] Lifting Operation Safety Management in AP1000 Nuclear Plant Project [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
- [3] The Summary and Research on Nuclear Island Construction and Erection Cost Management of AP1000 Nuclear Power Plant Project [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 941 - 953
- [4] The AP1000 Plant and the China Project Commissioning Success [J]. JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2019, 5 (01):
- [5] The Usage and Research of "Potential Trend Notice" in Sanmen AP1000 Nuclear Power Plant Construction Project Change Management [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 955 - 964
- [6] ATWS accident analysis for AP1000 nuclear power plant [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (SUPPL.1): : 161 - 165
- [7] Analysis of passive residual heat removal system in AP1000 nuclear power plant [J]. INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENTAL DEVELOPMENT, 2019, 214
- [8] Precooling Study on FCD Concrete Aggregate in Haiyang AP1000 Nuclear Power Project [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1274 - +
- [9] A KNOWLEDGE MANAGEMENT METHOD BASED ON ONTOLOGY FOR AP1000 NUCLEAR [J]. MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 377 - 380