Study on HSE Management system of AP1000 Nuclear Plant Project

被引:0
|
作者
He Xiaogang [1 ]
Fang Xiaopeng [1 ]
Wei Zhong [1 ]
Yang Yanli [1 ]
Sun Zhiyou [1 ]
机构
[1] State Nucl Power Engn Co, Shanghai 200233, Peoples R China
关键词
HSE; (Healthy; Safety and Environment); Management System; Modular Construction; Open-top Method; AP1000 Nuclear Plant; Nuclear Power;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Being a third generation advanced nuclear plant type, AP1000 has the characteristics of modular construction, "Open-Top" method lifting, etc, which simultaneously present a new challenge for site HSE management. Through studying Health, Safety & Environment (HSE) site management of the first AP1000 nuclear plant (ANP) under construction, this research analyzes the difference of HSE management aspects, such as management commitment and responsibility, HSE awareness and concept, training and education, HSE reward & punishment system and other aspects between China and the west. It also puts forward the specific idea for developing site HSE management system suitable for ANP technology characteristic and China's actual conditions, which will provide a guarantee for the safe and smooth construction of ANP project.
引用
收藏
页码:385 / 390
页数:6
相关论文
共 50 条
  • [1] Study on Schedule Control in AP1000 Nuclear Plant Project
    Fang Xiaopeng
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 181 - 186
  • [2] Lifting Operation Safety Management in AP1000 Nuclear Plant Project
    He Xiaogang
    Shortes, Shell
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
  • [3] The Summary and Research on Nuclear Island Construction and Erection Cost Management of AP1000 Nuclear Power Plant Project
    Yan, Zhaoyong
    [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 941 - 953
  • [4] The AP1000 Plant and the China Project Commissioning Success
    Friedman, Bryan N.
    [J]. JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2019, 5 (01):
  • [5] The Usage and Research of "Potential Trend Notice" in Sanmen AP1000 Nuclear Power Plant Construction Project Change Management
    Yan, Zhaoyong
    Qian, Yongzheng
    [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 955 - 964
  • [6] ATWS accident analysis for AP1000 nuclear power plant
    Chen, Wenhu
    Cai, Wei
    Ge, Zhenzhen
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (SUPPL.1): : 161 - 165
  • [7] Analysis of passive residual heat removal system in AP1000 nuclear power plant
    Sierchula, J.
    [J]. INTERNATIONAL CONFERENCE ON THE SUSTAINABLE ENERGY AND ENVIRONMENTAL DEVELOPMENT, 2019, 214
  • [8] Precooling Study on FCD Concrete Aggregate in Haiyang AP1000 Nuclear Power Project
    Wang, Shufeng
    Cong, Jiuyuan
    Li, Dayong
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1274 - +
  • [9] A KNOWLEDGE MANAGEMENT METHOD BASED ON ONTOLOGY FOR AP1000 NUCLEAR
    Lin Lin
    Zhang Yongjian
    Yin Lu
    [J]. MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 377 - 380
  • [10] New nuclear options - The AP1000
    Kasper, Ken
    [J]. HEALTH PHYSICS, 2006, 90 (06): : 519 - 520