共 50 条
- [41] Construction risk evaluation of tunnel based on the GPR geological forecast [J]. 2014 Fifth International Conference on Intelligent Systems Design and Engineering Applications (ISDEA), 2014, : 314 - 316
- [42] An Analysis of the Quality Risk and the Safety risk of Steel Tube Concrete Arch Bridge Construction [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 101 - 105
- [43] The Evaluation Model of Bridge Construction Safety Management Variable Fuzzy Sets [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1494 - 1498
- [44] Risk Assessment Method and Application for Tunnel Lining Demolition Construction [J]. APPLIED SCIENCES-BASEL, 2023, 13 (21):
- [45] Research on BIM Technology Modeling Method in Construction of Bridge Engineering [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY (ICREET 2016), 2017, 112 : 469 - 472
- [46] Automatic monitoring technology research on the key progress of construction of railway bridge, subgrade and tunnel [J]. J. Railw. Eng. Soc., 5 (59-64 and 85):
- [48] Three dimensional research on risk of China construction safety [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 141 - 144
- [49] Using Network Theory to Explore the Risk Characteristics of Bridge-Tunnel Hybrid Construction [J]. IEEE ACCESS, 2019, 7 : 116038 - 116046
- [50] Construction Optimization of the Bridge-Tunnel Sections [J]. FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 408 - 413