Construction Optimization of the Bridge-Tunnel Sections

被引:0
|
作者
Chao, Wan-li [1 ]
Wang, Xing-hua [1 ]
机构
[1] Cent S Univ, Sch Civil & Architectural Engn, Changsha 410075, Hunan, Peoples R China
关键词
bridge-tunnel sections; construction optimization; numerical simulation;
D O I
10.4028/www.scientific.net/AMR.430-432.408
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What's more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.
引用
收藏
页码:408 / 413
页数:6
相关论文
共 50 条
  • [1] 'CHESAPEAKE BAY BRIDGE-TUNNEL'
    SAVOIE, J
    [J]. CHRISTIANITY & LITERATURE, 1985, 34 (03) : 6 - 6
  • [2] CHESAPEAKE BAY BRIDGE-TUNNEL
    不详
    [J]. NATURE, 1963, 200 (491) : 1051 - +
  • [3] THE CHESAPEAKE BAY BRIDGE-TUNNEL
    GOODEY, BR
    [J]. GEOGRAPHY, 1965, 50 (02) : 169 - 171
  • [4] CHESAPEAKE BAY BRIDGE-TUNNEL PROJECT
    SVERDRUP, LJ
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1970, 46 : 1 - &
  • [5] CONCRETE BRIDGE-TUNNEL HAS NO DECK
    DENAPOLI, PA
    [J]. CIVIL ENGINEERING, 1977, 47 (04): : 75 - 77
  • [6] Technical challenges in the construction of bridge-tunnel sea-crossing projects in China
    Song, Shen-you
    Guo, Jian
    Su, Quan-ke
    Liu, Gao
    [J]. JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2020, 21 (07): : 509 - 513
  • [7] Parallel Tunnel Planned for Chesapeake Bay Bridge-Tunnel
    Reid, Robert L.
    [J]. CIVIL ENGINEERING, 2017, 87 (08): : 30 - 31
  • [8] Using Network Theory to Explore the Risk Characteristics of Bridge-Tunnel Hybrid Construction
    Chen, Fangyu
    Ji, Hongchang
    Wei, Yongchang
    [J]. IEEE ACCESS, 2019, 7 : 116038 - 116046
  • [9] Tradeoff optimization of key elements of technical interface of railway bridge-tunnel engineering
    Bao, Xue-Ying
    Li, Ya-Juan
    Hu, Suo-Ting
    Ban, Xin-Lin
    Wang, Lin
    Xu, Jian-Chao
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2022, 56 (03): : 558 - 568
  • [10] Causation Analysis for Bridge-Tunnel Hybrid Construction Accident based on FISM-DEMATEL
    Chen, Fangyu
    Wu, Xing
    Wei, Yongchang
    [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 1429 - 1434