Research Summary of Bridge and Tunnel Construction Safety Risk Evaluation Method

被引:2
|
作者
Tang, Chengtie [1 ]
Zhang, Zhenhao [2 ]
He, Zhigang [2 ]
机构
[1] Hunan Tongping Highway Construct Dev Co Ltd, Yueyang 410400, Hunan, Peoples R China
[2] Changsha Univ Sci & Technol, Changsha 410114, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
bridge engineering; tunnel engineering; construction safety; risk evaluation; summary;
D O I
10.4028/www.scientific.net/AMM.209-211.1402
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The risk of bridge and tunnel engineering in construction stage is a main subject which must be faced by bridge and tunnel engineer. Risk evaluation can analyze the happening possibility of construction safety accident and the consequence and loss caused by the accident. The research summary of risk evaluation method of bridge and tunnel construction safety is generalized in this paper. The main methods of risk evaluation at present are extrapolated, and the quality of each method is analyzed. The word of this paper will provide favorable reference for further research on risk evaluation of construction safety of bridge and tunnel engineering.
引用
收藏
页码:1402 / +
页数:2
相关论文
共 50 条
  • [31] Tunnel construction multivariate information forewarning and safety management system research
    Ye, Ying
    Mu, Qianxiang
    Zhang, Chengping
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (05): : 900 - 907
  • [32] Research on the Measures of Metro Mine Method Tunnel Construction Side-crossing Bridge Pile Foundation in Long Distance
    地铁矿山法隧道长距离侧穿桥梁桩基措施研究
    [J]. Bai, Dongfeng, 1600, Editorial Department of Journal of Railway Engineering Society (38): : 68 - 73
  • [33] Road, Bridge and Tunnel Engineering Construction Strengthening Technology of Grouting Method in Application
    Jin, Pengtao
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 456 - 459
  • [34] A method for assessing the crossed risk of construction safety
    Tian, Zhen
    Chen, Qianqian
    Zhang, Taihui
    [J]. SAFETY SCIENCE, 2022, 146
  • [35] Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method
    Mao, Yihua
    Zhang, Yaoyao
    [J]. PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 550 - 555
  • [36] Fuzzy method for safety evaluation of construction project
    Yao Jinbao
    Xia He
    Zhan Jiawang
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 229 - 233
  • [37] Research About Construction of Public Service Capacity of Safety Production Evaluation Indication System and Evaluation Method
    Liu, Yu
    Chen, Chao
    Shao, Xu
    Qian, Xinsen
    Zhang, Zhaohui
    [J]. PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 87 - 97
  • [38] Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method
    Zheng, Xin
    Ma, Fenghai
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1243 - 1248
  • [39] The Risk Analysis and Evaluation of Shanghai Changjiang Tunnel and Bridge Engineering Projects
    Zhang Guo-an
    [J]. 2010 INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATION AND 2010 ASIA-PACIFIC CONFERENCE ON INFORMATION TECHNOLOGY AND OCEAN ENGINEERING: CICC-ITOE 2010, PROCEEDINGS, 2010, : 342 - 346
  • [40] The Research Of The Expert System For Tunnel Construction Method Based On The Network
    Jing Haitao
    Zhang Yangsong
    Shi Xingxi
    Sun Rongguan
    [J]. EPLWW3S 2011: 2011 INTERNATIONAL CONFERENCE ON ECOLOGICAL PROTECTION OF LAKES-WETLANDS-WATERSHED AND APPLICATION OF 3S TECHNOLOGY, VOL 2, 2011, : 188 - 192