Study on the BT Financing Model of Non-business Public Building in the Post-disaster Reconstruction - Case Study of GuangYuan

被引:0
|
作者
Liu Hongyong [1 ]
Deng Li [1 ]
机构
[1] Southwest Petr Univ, Sch Civil & Architecture, Chengdu 610500, Sichuan, Peoples R China
关键词
Non-business public building; post-disaster reconstruction; BT financing mode;
D O I
暂无
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
Wenchuan earthquake caused great damage to Sichuan Province, the post-disaster reconstruction faced tremendous financial pressure. Taking Guangyuan as an example, through investigating the construction financing source of non-business public building, analysing the conditions of BT financing model which was used to the non-business public building construction, and then put forward that after the three years rebuilding period, the non-business public building construction could adopt BT financing mode. Drawing the diagram of non-profit public buildings BT project financing mode, and analysing the advantages and disadvantages of BT financing mode which was used to the non-profit public building, and got that BT financing model used to the non-business public building could alleviate the government post-disaster reconstruction pressure, and the project investors could also obtain good returns.
引用
收藏
页码:349 / 352
页数:4
相关论文
共 50 条