Risk Assessment Method of ERP Project Based on Risk Matrix and AHP

被引:0
|
作者
Yang, Xiaoping [1 ]
Zhuang, Qiaojuan [1 ]
He, Miao-Hua [1 ]
机构
[1] Renmin Univ China, Informat Sch, Beijing 100872, Peoples R China
关键词
Risk Matrix; AHP; ERP; Risk Assessment;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Risk Assessment is of great importance to ERP risk management. Based on the analysis of the weakness of Risk Matrix, this paper discusses how to apply Risk Matrix with AHP to assess ERP risk.
引用
收藏
页码:473 / 476
页数:4
相关论文
共 50 条
  • [21] Risk Assessment Method of CTCS System Network Security Based on AHP
    Yao, Honglei
    Liu, Guoliang
    Xie, Chenhui
    Yang, Yijie
    Niu, Wenjia
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (04): : 241 - 250
  • [22] Food safety risk assessment and countermeasures in China based on risk matrix method
    Yu, Huiqin
    Song, Yinghua
    Lv, Wei
    Liu, Dan
    Huang, Haining
    [J]. FRONTIERS IN SUSTAINABLE FOOD SYSTEMS, 2024, 8
  • [23] Project logistics risk assessment based on the fuzzy comprehensive assessment method
    Jun, Zhang
    [J]. TENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I AND II, 2011, : 1008 - 1012
  • [24] Risk Assessment of R&D Project Using AHP
    Zhang Jinsong
    Wang Xiangzhou
    [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 1, 2010, : 331 - 334
  • [25] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [26] Risk Assessment on the PPP Financing Project of AHP-based Urban Rail Transit
    Wang Jianbo
    Sheng Xueyan
    Liu Xianning
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 362 - 366
  • [27] Risk Management of International Project Based on AHP and FMEA
    Zhong, Jia
    Lin, Zhiyu
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2665 - 2670
  • [28] A Risk Management Methodology for R&D Project Risk Based on AHP and Fuzzy Comprehensive Evaluation Method
    Jiang, Wenbo
    Chai, Huaqi
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 320 - 324
  • [29] A Synthetic Risk Assessment Model Based On AHP
    Zhao, Yuan
    Jiao, Jian
    Zhao, Tingdi
    [J]. 2014 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2014,
  • [30] The Assessment of Risk of the ground fissures Based on AHP
    Xu, Mingxia
    Li, Bin
    Xu, Yonglong
    Yan, Fangfang
    Wu, Di
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1153 - 1156