共 50 条
- [2] Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1205 - 1209
- [3] Rail Transit Project Risk Evaluation Based on AHP Model [J]. ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 3, PROCEEDINGS: APPLIED MATHEMATICS, SYSTEM MODELLING AND CONTROL, 2009, : 236 - 238
- [4] Study of PPP Investment and Financing Models in Urban Rail Transit [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 1505 - 1509
- [5] AHP-based Method for Military Defence Project Risk Assessment [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 3039 - 3042
- [7] Real Option in Urban Rapid Rail Transit PPP Project [J]. ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 437 - 442
- [8] Assess Risk of PPP Project on Urban Rail Transport Based on FAHP [J]. PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 486 - 489
- [9] Study on Supervision Organization on PPP Project of Urban Rail Transit in China [J]. PROCEEDINGS OF 2017 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (12TH) & INTERNATIONAL SYMPOSIUM ON WEST AFRICAN STUDIES (1ST), VOL I, 2017, : 592 - 598
- [10] Comprehensive Evaluation and Selection of Project Financing Model of Urban Rail Transit [J]. SEVENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III: UNLOCKING THE FULL POTENTIAL OF GLOBAL TECHNOLOGY, 2008, : 1588 - 1594