Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects

被引:140
|
作者
Li, Jie [1 ]
Zou, Patrick X. W. [2 ,3 ,4 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Nanjing, Peoples R China
[2] Univ Canberra, Fac Business & Govt, Canberra, ACT 2601, Australia
[3] Univ New S Wales, Fac Built Environm, Sydney, NSW, Australia
[4] Hunan Univ, Risk Management Coll Civil Engn, Changsha 410082, Hunan, Peoples R China
关键词
PPP project; Fuzzy; Analytical hierarchy process (AHP); Risk assessment;
D O I
10.1061/(ASCE)CO.1943-7862.0000362
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public Private Partnerships (PPPs) have been used globally as a method to procure infrastructure projects, such as expressways, bridges, water plants, and power plants. The risks involved in such PPP projects are unique because of the large amount of investment and long contractual concession period. This paper proposed a fuzzy analytical hierarchy process (AHP) as risk assessment technique to simulate the vagueness of human judgement and to improve the assessment accuracy. Furthermore, a comparison was made between the proposed fuzzy AHP and straight-AHP in this paper. The fuzzy AHP process was illustrated by using an actual PPP expressway project from China. The results showed that planning deficiency, low project residual value (after 30 years of operation), lack of qualified bidders, design deficiency, and long project approval time were assessed as the top five risks for the project, and the feedback from the experts showed that these results reflected the actual project risk situation. DOI: 10.1061/(ASCE)CO.1943-7862.0000362. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:1205 / 1209
页数:5
相关论文
共 50 条
  • [1] Risk Assessment on the PPP Financing Project of AHP-based Urban Rail Transit
    Wang Jianbo
    Sheng Xueyan
    Liu Xianning
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 362 - 366
  • [2] A fuzzy AHP-based methodology for project prioritization and selection
    Amir Shaygan
    Özlem Müge Testik
    [J]. Soft Computing, 2019, 23 : 1309 - 1319
  • [3] A fuzzy AHP-based methodology for project prioritization and selection
    Shaygan, Amir
    Testik, Ozlem Muge
    [J]. SOFT COMPUTING, 2019, 23 (04) : 1309 - 1319
  • [4] Construction Projects Risk Assessment based on Fuzzy AHP
    Gohar, A. Sotoodeh
    Khanzadi, M.
    Jalal, M. Parchami
    Javid, A. A. Shirzadi
    [J]. 2009 IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT: SCORED 2009, PROCEEDINGS, 2009, : 570 - 573
  • [5] An AHP-based fuzzy evaluation on business merge risk
    Jiang Shuo
    Cao Hongmei
    [J]. ICCSE'2006: Proceedings of the First International Conference on Computer Science & Education: ADVANCED COMPUTER TECHNOLOGY, NEW EDUCATION, 2006, : 47 - 50
  • [6] An AHP-based Risk Assessment for an Industrial IoT Cloud
    Huang, Yu-Lun
    Sun, Wen-Lin
    [J]. 2018 IEEE 18TH INTERNATIONAL CONFERENCE ON SOFTWARE QUALITY, RELIABILITY AND SECURITY COMPANION (QRS-C), 2018, : 637 - 638
  • [7] AHP-based risk analysis of energy performance contracting projects in Russia
    Garbuzova-Schlifter, Maria
    Madlener, Reinhard
    [J]. ENERGY POLICY, 2016, 97 : 559 - 581
  • [8] Life cycle risk assessment of PPP infrastructure projects using fuzzy Analytical Hierarchy Process (AHP)
    Li, Jie
    Peng, Yuan
    Zou, Patrick X. W.
    [J]. PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 1000 - 1016
  • [9] Action Selection Based on Fuzzy AHP-Based TOPSIS Method in Fuzzy FMEA-Based Risk Assessment: A Case Study
    Oturakci, Murat
    Konyalioglu, Aziz Kemal
    [J]. INTELLIGENT AND FUZZY SYSTEMS: DIGITAL ACCELERATION AND THE NEW NORMAL, INFUS 2022, VOL 1, 2022, 504 : 369 - 377
  • [10] AHP-Based Risk Assessment for Overboard-Man at Sea
    Liu, Hu
    Ding, Tian-ming
    [J]. INTERNATIONAL CONFERENCE ON MECHANICAL DESIGN, MANUFACTURE AND AUTOMATION ENGINEERING (MDMAE 2014), 2014, : 169 - 174